![Renogy MTS-SP100 Important Safety Instructions Manual Download Page 9](http://html1.mh-extra.com/html/renogy/mts-sp100/mts-sp100_important-safety-instructions-manual_1442970009.webp)
9
Slide U-Bolt through back face of L-Channel
A. Hold the assembled system up to pole so that L-Channel (B) back face is flush to surface
of the pole and slide the U-Bolt (E) through the holes.
B. Fasten U-Bolt (E) with a large washer (L) and 1 or 2 nuts (M) (depending on how much
thread is available.
C. Repeat for bottom L-Channel and last U-Bolt.
Figure 2
E
L
M