7 INSTALLATION
INSTRUCTIONS
7.1 General
All gas appliances must, by law, be installed by a competent qualified engineer regis-
tered with CORGI and holding the relevant qualifications and certificates (for example
ACOPS and IEE regs.)
The complete installation must comply with the current editions of relevant British
Standards and codes of practice, including the latest local and national regulations for
this type of equipment.
Important:
The Remeha Quinta 45 and 65 are CE certified applianced and must not therefore
be modified or installed in any way contrary to these “Installation and Maintenance
Instructions”.
These manufactures Instructions must NOT be taken as overriding statutory obligati-
ons. Failure to install this appliance correctly could result in an unsafe condition which
can lead to prosecution. It is your own interest and that of safety to ensure that the law
is comlied with.
7.2 Location
The remeha Quinta 45 and 65 is prima-
rily designed for wall mounting (on the
bracket supplied). The wall should be
flat, vertically plumb and capable of sup-
porting the full weight of the boiler full
of water. An optional floor frame can be
used for a free standing installation or
where the wall cannot carry the weight.
The following minimum clearances are
required:
- Front: 600 mm (25 mm if mounted
behind door)
- Sides: 25 mm
- Bottom: 250 mm
- Top: 400 mm.
Fig. 05
Minimum clearances around
the boiler
05W4H7900003