Supplied By www.heating spares.co Tel. 0161 620 6677
Remeha Gas
550/550 Duo
14
9
ELECTRICAL SUPPLY
9.1 General
The electrical installation must conform to the IEE regu-
lations and also to local authority requirements.
9.2 Instrument panel
The Gas 550 is supplied with an instrument panel that
is fitted in the front of the boiler, either left or right
(dependant on flow and gas connection).
Note:
The Gas 550 Duo has two instrument panels and
requires two sets of power supplies.
9.3 Control panel
A control panel is fitted on the gas train.
Note:
The Gas 550 Duo has two control panels and
requires two sets of operating controls and has two sets
of function indication.
9.4 Electrical connections
The boiler is pre-wired. Only the main supply should be
wired to the instrument panel.
9.5 Electrical information
Main supply
: 230 V-50 Hz (L/N)
Running current : 150 VA
Maximum fuse
: 6 A (slow acting)
Note:
The Gas 550 Duo requires two sets of power supplies.
9.6 Water level control
Water level control
: Dungs DWEB 53E
Main supply
: 230 V – 50 Hz
Running current
: 5 W
Electrode voltage
: 42 V (AC)
Working area
: 100 – 10.000 mA (AC)
Electrode resistance : max. 20 kOhm; min. 1 kOhm
Electrode
: Dungs FLE ½”
Must be fitted in one of the end sections (see 7.4).
Note:
The Gas 550 Duo has two sets.