![RelaDyne THERMOJET H-2500E Series Installation And Operating Manual Download Page 24](http://html1.mh-extra.com/html/reladyne/thermojet-h-2500e-series/thermojet-h-2500e-series_installation-and-operating-manual_1435629024.webp)
THERMOJET
®
H-2500E SERIES
OIL PURIFIER SYSTEM
INSTALLATION AND OPERATING MANUAL
Doc #
77740119
Rev
15
Date
June 2020
Page
24
of
100
Access the power terminals by unscrewing the cover on the terminal enclosure. Service power to the
ThermoJet Oil Purifier originates at terminals L1,-L2 and L3 located in a terminal enclosure. See the
diagrams below for terminal location and user terminal connection identification. The power connection is
three phase. Voltage is as specified on the equipment nameplate. Once all cable connections are securely
connected, reinstall the enclosure cover.
To avoid risk of explosion hazard, the Terminal
Enclosure cover must be securely closed with the
threaded cover.
WARNING
Input Power Connects to L1 – L2 – L3