Commissioning
18 / 44
TARAtec 9/10
Carefully withdraw the tweezers from the membrane cap.
The G-holder is now positioned in the membrane cap.
Place the sensor body [1] upright on the membrane cap [2].
Rotate the sensor body anticlockwise until the thread is felt to
engage.
Fig. 7:
Placing the sensor body on the sensor cap
1
Sensor body
2
Membrane cap
Slowly screw the sensor body into the membrane cap.
Make sure that the membrane cap is fully screwed into the
sensor body, right up to the stop.
Once the membrane cap has been fully screwed on:
Neither touch nor strike the membrane.
Use mains water to rinse off any electrolyte residues adhering to the
sensor.
The sensor is now prepared for commissioning.
Fig. 8:
Prepared sensor