Remove 2 x upright securing bolts and
move the upright to the appropriate
setting by lifting from the strut handle
Re-secure with bolts, nuts and washers
(do not over tighten). Repeat the height
adjustment at the opposite end
The gantry is now erect at its lowest height setting.
Release trolley and castor brakes to position the
gantry over the load, ensuring if possible that the
load is lifted from the center of the beam
Beam height adjustment bolts (2 bolts on each upright).
Tighten all bolts to 27 Nm (20 ft lbs) or until spring washers
are fully depressed.
Assembly Instructions
Insert and tighten the final beam bolt
Decide on the height required (always using the
lowest possible setting)
If the hoist is not already attached to the
suspension point on the trolley, do so now (using
stepladder if height setting requires)
Ensure the beam is horizontal and
castors are locked prior to any lift.
21
20
20a
19
17
18