![REID LIFTING PORTA GANTRY 1100 Assembly & Operation Manual Download Page 14](http://html1.mh-extra.com/html/reid-lifting/porta-gantry-1100/porta-gantry-1100_assembly-and-operation-manual_1435106014.webp)
Bolt 2
Bolt 1
The gantry beam has adjustment holes to narrow the
footprint of the gantry. If this process is required to
be carried out often then an upgrade to ‘lobed cheek
plates’ can be purchased which allows the gantry to be
assembled as steps 8-21 but with one A-Frame inward
from the end of the beam.
This illustration demonstrates the bolt positions
(1 & 2) for the cheek plates.
Lay the two A-Frames a beam length apart on a
flat surface in line with each other with the castor
wheels outward and brakes on
Lay the beam on the Aframes, resting on bolt 1 on
each cheek plate
Thread the beam trolley over the other end
of the beam and lock with the friction brake at
approximately centre position. If using a gated
trolley, lock with the friction break
Offer one end of the beam to the rear bolt-hole
on the cheek-plate (bolt 1) and insert a bolt
Put on plain washer, spring washer then nut,
finger tight
Assembly Instructions
Carry out a pre-assembly visual check to ensure
the following parts are included;
Beam
Trolley
2 x A-Frames
Tool Set (Option)
7
8
9
10
6
9a