City Series CV72E
|
57
installation
Vertical Terminations -
Rigid/Flex Pipe 5" x 8
"
• Two 45
o
elbows equal to one 90
o
elbow. Maximum of six 45
o
elbows allowed.
• Vent must be supported at offsets.
• Minimum distance between elbows is 1 ft. (305mm).
• Maintain clearances to combustibles as listed in the "Clearances" section.
• Horizontal vent must be supported every 3 feet.
• Firestops are required at each floor level and whenever passing through a wall.
• Must use optional rigid pipe adaptor (Part# 770-994 when using rigid pipe vent systems
)
Vertical Venting with Three (3) 90
o
Elbows
One 90
o
elbow = Two 45
o
elbows.
V
H1
H
V1
Option
V
H + H1
V + V1
With these options,
max. total pipe length
is 30 feet with min. of
10 feet total vertical
and max. 8 feet total
horizontal.
Please note min. 1
foot between 90
o
elbows is required.
A)
1' Min.
2' Max
3' Min.
B)
2' Min.
3' Max
4' Min.
C)
3' Min.
4' Max
6' Min.
D)
4' Min.
5' Max
7' Min.
E)
5' Min.
6' Max
8' Min.
F)
6' Min.
7' Max
9' Min.
G)
7' Min.
8' Max
10' Min.
Lengths do not include elbow indicated
Restrictor Set 0 - Factory Setting
Summary of Contents for City CV72E-LP11
Page 104: ...104 City Series CV72E ...
Page 105: ...City Series CV72E 105 notes ...
Page 106: ...106 City Series CV72E notes ...
Page 107: ...City Series CV72E 107 ...