Regency Bellavista™ B36XT Gas Fireplace
15
INSTALLATION
UNIT ASSEMBLY PRIOR TO INSTALLATION
BEFORE YOU START
The Top Facing Support, the Side Nailing Strips, the 2 Top Standoffs and the Flue Collar must be correctly positioned and attached before the fi replace
is moved into position.
TOP FACING SUPPORT
Determine the total thickness of facing material (e.g. drywall or wood plus ceramic tiles) to
allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary
from 1/2" (13mm) to 1-1/4" (32mm) thick.
The Top Facing Support can be mounted in
3 different positions depending on the
thickness of the facing material.
1)
Mount Top Facing Support using the 3 supplied screws into the three pre-punched
screw holes on the top front of the unit. Use hole positions A, B, or C depending on your
facing depth.
Screw Facing
Material
Position
Depth
A
1/2" / 13mm
B
7/8" / 22mm
C
*
1-1/4" / 32mm
*
For "C" screw position the top facing
support is reversed.
Top Facing Support
A
B
C
Screw holes for
Top Facing
Support
Top Facing Support
is reversed
for “C” hole position
A
B
C
"C" Screw Position:
For a facing material depth of 1-1/4" (32mm),
the top facing support must be reversed.
Top Facing
Support
SIDE NAILING STRIPS
The side nailing strips come attached to the unit.
There are 2 plates, one on the top and bottom
that can be folded out as required.
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a fl at position and must be folded into shape and
attached.
1) Take each standoff and bend into the correct shape. Bend up at the bend lines
until the screw holes in the standoff and the pre-punched slots on the fi replace
top line up. Be sure to use correct slots, they are marked.
3) Attach the standoff securely to the top with 2 screws per standoff (on opposite
corners).