Framing & Finishing

Note: When constructing the framed opening, please 

ensure there is access to install the gas lines when 
the unit is installed. 

2)

  For exterior walls, insulate the enclosure to the same degree as 

the rest of the house, apply vapour barrier and drywall, as per local 
installation codes. 

(Do not insulate the fireplace itself and/or the 

venting. Clearances must be maintained as per this manual.)

 

WARNING: Failure to insulate and add vapor barriers to the 
inside of the exterior wall will result in operational and per-
formance problems including, but not limited to: excessive 
condensation on glass doors, poor flame package, carbon, 
blue flames etc. These are not product related issues.

3)

  The unit does not have to be completely enclosed in a chase. You 

must maintain clearances from the vent to combustible materials: 
See  "Clearances"  section.    Combustible  materials  can  be  laid 
against the side and back standoffs and the stove base.

4)

  Non-combustible material (ie. tile, slate, etc) may be brought up to 

and overlap the unit (top and bottom) ensuring that the maximum 
thickness does not go beyond the 1-1/2" as shown in the diagram 
below. The faceplate will not be able to be mounted if  finished 
material is beyond 1-1/2".

1)

  Frame in the enclosure for the unit with framing material. 

 

IMPORTANT: The facing material must be of non-combustible 

      material.

5)

  If material such as brick, stone, etc extends past the faceplate depth 1-1/2", 

when finishing around the faceplate, the minimum opening dimensions 
noted below must be adhered to ensuring for the removal of the faceplate 
and for the safe operation of this appliance.

NOTE:

 Spacing of 1"around the completed surround must be adhered to.

Unit shown with inner door frame only

Using the clean edge of the unit shown in 

a typical tiled facing. 

39-7/16”

17-1/2

Ensure  front  of  facing  material  is  flush  with 
the edge of the flange on the fireplace. 

U900E-11 Gas Fireplace

Summary of Contents for U900E-11

Page 1: ...High 3 5 W C 0 87 kPa 10 W C 2 48 kPa Manifold Pressure Low 1 6 W C 0 41 kPa 6 4 W C 1 59 kPa Orifice Size Altitude 0 4500 ft 35 DMS 52 DMS Minimum Input Altitude 0 4500 ft 0 1372m 23 500 BTU h 6 89 k...

Page 2: ...ght 20 508mm I Gas Connection Opening Height 1 11 16 43mm J Gas Connection Height 2 11 16 67mm K Gas Connection Inset 1 1 8 29mm L Gas Connection Opening Width 4 11 16 119mm Framing depth measurement...

Page 3: ...nce that this fireplace and vent system be installed only in accordance with these instructions Clearance Dimension Measured From A Mantel Height min 20 508mm Top of Fireplace Opening B Sidewall on on...

Page 4: ...is used on the mantel and the facing is high quality or the paint may discolour Mantel Leg Clearances Combustible mantel leg clearances as per diagram Note A non combustible mantel may be installed at...

Page 5: ...using a product called Durabond high strength compound for the first coat This product can be found at any hardware store Mud must be cured as per manufacturer s recommendations 6 Prime wall for a se...

Page 6: ...on Combustible materials can be laid against the side and back standoffs and the stove base 4 Non combustible material ie tile slate etc may be brought up to and overlap the unit top and bottom ensuri...

Page 7: ...ical as the installation itself The temperatures around linear gas fireplaces are typically higher than would be acceptable for combustible materials Your Regency Horizon Fireplace is no exception to...

Page 8: ...p adjust and retighten screws 4 Attach both vertical studs 466 126 to the vertical wood studs and secure using 6 screws 2 at bottom 2 at top and 2 on sides as shown NOTE Ensure the flat side of the st...

Page 9: ...minations The diagram shows all allowable combinations of vertical runs with horizontal terminations using one 90o two 45o elbows equal one 90o elbow Note Must use optional rigid pipe adapter Part 510...

Page 10: ...elbows equal to one 90o elbow Vent must be supported at offsets Minimum distance between elbows is 1 ft 305mm Maintain clearances to combustibles as listed in the Clearances section Horizontal vent m...

Page 11: ...ne 90o elbow Two 45o elbows Option V H H1 With these options maxi mumtotalpipelengthis30 feetwithminimumof6feet totalverticalandmaximum 8 feet total horizontal Please note minimum 1 footbetween90o elb...

Page 12: ...ver keeptheflexible linerasstraightaspossible avoidunnecessarybending The Air Intake pipe must be attached to the inlet air collar of the termination cap Required Parts Part Description 946 529 Co lin...

Page 13: ...diagrams show the allowable vertical terminations Restrictor Position Set 0 3 Factory Setting Venting Arrangements Vertical Termination with Co linear Flex System for both Residential Manufactured Hom...