LRI3E-11 / HRI3E-11 Direct Vent Gas Insert
| 49
maintenance
tooltip
Diagram 7
8. Lift out panel (part of valve assembly) with valve and pilot assembly.
9. Replace with new valve assembly, ensuring to use a new gasket before
securing new valve access plate to unit.
10. Reassemble unit by reversing Steps 8-1.
11. Reconnect the gas and electrical supply to the unit. Once the unit has
been refired, use a soapy water mixture to check all fitting and gas sup-
ply lines for gas leaks.