84
|
City Series CV72EPV
installation
Glass Panel Installation
919-828
09.25.17
CV72E GLASS PANEL INSTALLATION
1. Turn off power and gas to unit and allow to cool to room temperature.
Remove the safety glass and fi rebox glass — see manual for instructions.
Note:
The screws to secure all of the clips in these instructions will be already be
on the appliance. Simply remove and reinstall to secure all of the clips.
2. Identify panels and order of installation.
WRROWLS
,QVWDOO3DQHOV
WRROWLS
,QVWDOOEDVHSDQHOV
3. Install back corner panels
(1, 2)
- seat smallest panel in back left corner,
repeat on other side.
5. Install the 3 front panels
(3, 4, 5)
into the front fi rebox panel.
6. Install two back panel brackets in between the back wall and the burner
tray. Line up the center of each bracket with the base panels installed in the
previous step as shown below.
7. Carefully manoeuvre the back glass panels
(6,7,8)
to the back wall of the
fi rebox. Start with back panel
6
-- place two panel brackets on each panel and
manoeuvre into position, sliding the bottom into the corner and back brackets.
8. Secure the top of the panel brackets with 2 screws into 2 brackets (each
panel has 2 brackets).
4. Install bottom corner securing bracket as shown. Repeat step for other side.
Secure bracket
Secure bracket in place
WRROWLS
%DFNSDQHOEUDFNHWV
WRROWLS
6OLGHEDFNSDQHOLQWREDVHEUDFNHWV
WRROWLS
Secure 2 top brackets
9. Repeat Steps 7 & 8 to install back panels
7 + 8.
10. Install side panel
9
-- manoeuver into top and bottom brackets.
6
9
1
CITY SERIES
Summary of Contents for City CV72E Series
Page 113: ...City Series CV72EPV 113 notes ...
Page 118: ...118 City Series CV72EPV warranty ...
Page 119: ......