34
|
City Series ACC40E
installation
Building Additional Framing Off of the Framing Kit
919-773a
04.24.17
Holes for fi xing additional
framing to kit
Potential Wood Framing installs
This framing kit is designed as a base in which to build additional
framing. Studs can be affi xed to all outer faces using the holes
identifi ed below. This will provide a stable surface that is fl ush with
the front of the fireplace, ready for or plasterboard or other finishing
material.
The framing must be strong enough to support the weight of all
fi nishing material and must not put any weight on the fi replace.
BUILDING FRAMING OFF OF THE KIT
13 mm for plasterboard
Leave gap between
framing and unit trim
for finishing material
4
CITY SERIES
Summary of Contents for ACC40E City Series
Page 79: ...City Series ACC40E 79 notes ...
Page 85: ...City Series ACC40E 85 notes ...
Page 86: ...86 City Series ACC40E ...
Page 87: ...City Series ACC40E 87 notes ...