7
Any revisions must first be approved by the product designer. Version: 201808
Revision By: JST
17.
HANDLE INSTALLATION
Assemble the handles as shown.
18.
METAL TOP BRACE INSTALLATION
Place the Top Brace onto the fixed glass
panels in the position as shown. Lightly
tighten grub screws. (
BAG-AU-MTB)
onto
the glass panels.
Fit 2,3 or 4 top brace blocks to the top
brace bar at your discretion. Atlantis
suggests that two top brace blocks are
fitted for any panel measuring wider than
230mm.
Lightly tighten the grub screws
2 Wall LH Screen
DOOR SIZ
E + 10mm
45mm
IF NECESSARY, TRIM
THIS END OF THE TOP
BRACE TO LENGTH
*
2 Wall RH Screen
DOOR SIZ
E + 10m
m
IF NECESSARY, TRIM
THIS END OF THE TOP
BRACE TO LENGTH
45mm
*
*
Please note that this block is not required and not supplied for showers measuring 900mm or less
Summary of Contents for Atlantis Glacier SFK-GL-HR
Page 1: ...SFK GL HR...