background image

Any revisions must first be approved by the product designer.   Version: 201808 

Revision By: JST 

 

 

 

 

 

 

GLASS RECEIVER CHANNEL MUST BE 

INSTALLED ONTO THE WATERPROOFING 

BEFORE THE WALLS ARE TILED 

INSTRUCTIONS FOR 

2 WALL SYSTEM 

 
 

1.

 

Choose door location. 

 

2.

 

Position the glass receiver channels over 
the base glazing channels. Mark the wall 
to indicate where the wall channels are 
plumb.  

 

 

 

3.

 

Mask two sides of wall channel before 
applying white silicon.  Apply a continuous 
8mm bead of white silicon to full length of 
wall channels in groove as indicated.  

 

 

 
 
 
 
 
 
 
 
 
 

4.

 

Ensure the glass receiver channels are 
located firmly over the base glazing 
channels. Locate the framing timber. Use 
the 4mm drill bit to drill holes through the 
glass receiver channels. Fix four screws 
through the channels into the wall 
framing (use wall plugs if required 
supplied with wall channels). 
 

 

 

 Apply a 10mm continuous bead of Sika 
Artic White silicon, to the full length of 
each wall channel.  Silicon seal the join 
where the wall and base channel will 
intersect.   
 

 
 
 
 
 
 
 
 

Summary of Contents for Atlantis Glacier SFK-GL-HR

Page 1: ...SFK GL HR...

Page 2: ...ver Channels WCT Below components included in WCT 1 x Glass Return Panel B 1 x 8x6Gx40 Sq drive screws wall plugs 1x4mm drill bit 1 x Fixed Panel with 2 Cutouts C 2 x Edge Seal optional 1 x Metal Top...

Page 3: ...el before applying white silicon Apply a continuous 8mm bead of white silicon to full length of wall channels in groove as indicated 4 Ensure the glass receiver channels are located firmly over the ba...

Page 4: ...nnel covering exposed liner edge as shown Wall Cover Silicon Top view of wall channel Double Sided Tape GLASS INSTALLATION Keep glass standing upright Once package containing glass is opened check gla...

Page 5: ...ing channels The top of panel B must be level with the top of the opposite glass receiver channel Adjust the height of the panel if necessary by adding or removing the plastic packers in the base glaz...

Page 6: ...ss door 14 HINGE INSTALLATION Atlantis glass is now coated with CristalCote glass protection at the factory This coating may cause the hinge to slip after installation Atlantis recommends cleaning aro...

Page 7: ...oor between the side panels and tighten the hinge bolts firmly with the 4mm hex key supplied ENSURE HINGES ARE CLEAR FROM SIDES OF GLASS CUTOUTS AND HINGE BOLTS ARE FINALLY TIGHTENED AS MUCH AS POSSIB...

Page 8: ...the glass panels Fit 2 3 or 4 top brace blocks to the top brace bar at your discretion Atlantis suggests that two top brace blocks are fitted for any panel measuring wider than 230mm Lightly tighten...

Page 9: ...TION OF BOTTOM DOOR SEAL Trim to length if necessary Clip onto the bottom of the door Ensure the sloping face is inside the shower OPTIONAL DOOR SEALS Two vertical edge seals are supplied with the wal...

Page 10: ...r channel is plumb 3 Mask two sides of wall channel before applying silicon Apply a silicon seal to full length of channel Silicon used must be compatible with anodised aluminium as well as the waterp...

Page 11: ...IES IF ACRYLIC LINER HAS BEEN SUPPLIED Fix liner cover to wall channel covering exposed liner edge as shown Wall Cover Silicon Top view of wall channel Double Sided Tape GLASS INSTALLATION Keep glass...

Page 12: ...anels should align to the top of the glass receiver channels Add or remove packers in the base glazing channel as necessary for glass height alignment 9 SILL INFILL Apply a continuous bead of clear si...

Page 13: ...h Fuelite fuellite is available from petrol stations Alternatively the area can be lightly sanded with 300grit sandpaper 14 ADJUSTABLE HINGES Atlantis showers are now supplied with adjustable hinges C...

Page 14: ...OOR REALIGNMENT Use 3mm key on the cap screws near the pivot to loosen the screws align the door to desired position and then tighten This will set the new 0 degree point 16 HANDLE INSTALLATION Assemb...

Page 15: ...20 SILICON APPLICATION Mask the glazing channel and glass at the intersections as shown Apply clear silicon to the inside and outside of the base and wall receiver channels Remove the excess silicon R...

Reviews: