3
Any revisions must first be approved by the product designer. Version: 201808
Revision By: JST
TILED WALLS -
apply an additional bead of
silicon to the inside of the waterproofing
ELLURE WALLS / ACRYLIC LINER -
apply an
additional bead of silicon to the outside of
the acrylic liner/Ellure Walls.
5.
THIS STEP ONLY APPLIES IF ACRYLIC
LINER HAS BEEN SUPPLIED.
Fix liner cover to wall channel covering
exposed liner edge as shown.
Wall
Cover
Silicon
Top view of wall channel
Double
Sided Tape
GLASS INSTALLATION
Keep glass standing upright. Once package
containing glass is opened, check glass is
facing same direction up as label, do not
sit glass directly on floor, always sit glass
on polystyrene packaging or similar
padded surface. Keep glass level with
floor to avoid hitting corners on hard
surfaces.
6.
PREPARATION FOR GLASS INSTALLATION
Slide the sill infill into position and apply
6mm plastic packers (
BAG 11
) into the
base glazing channels in locations as
shown.
Summary of Contents for Atlantis Glacier SFK-GL-HR
Page 1: ...SFK GL HR...