General
1
B6_Control_SYS20_EN_V1.3.doc
Art. Nr. 102-020401135
6 / 36
B4_Assembly TOS
General
TOS installations – for escape and rescue routes
Mounting profile and tracks
Mounting and setting the side leaves
Locking
Electrical connections
B5_Options General
Locking
Installation of CO48
Extended function module
Battery / Accumulator
Operator casing
Fanlight
Protective screen
B6_Control General
Control module STM 20
Control module STM 20 RED / DUO
Control module STM 21
Control module STM 21 RED
Control module STM 22 RED / DUO
B7_Commissioning General
Principles for commissioning
The CAN-bus
BDE-D Operating unit
Operating instructions Easy-Programmer EPC 903
Start-Up
Commissioning of systems
Parameter explanations
B8_Annex General
Module types cladding height 200 mm
Drive module
Drawings
Article list
B9_Assembly and Start-
Up FTA/FBO
General
Technical Data
Elevation/drawing of header FTA/FBO
Installation FTA/FBO 20
Parameter
Options
1.3. Instruction
manual
After the system installation, the instructions have to be stored in an accessible and dry place.