background image

20

REC Installation Manual - REC Alpha Panels  - IEC 61215 /61730
Rev 13 - 11.22 

Ref: PM-IM-23

PANEL MAINTENANCE

CLEANING INSTRUCTIONS

REC solar panels have been designed for easy maintenance, however cleaning solar panels can assist in optimizing electricity output. The need for 

cleaning will vary dependent on location, rainfall, pollution levels and the angle of installation – the lower the angle of installation, the more cleaning 

will be required. ‘Normal’ rainfall will naturally clean the panels if installed at a sufficient angle to ensure water runs off the surface. To optimize 

electrical output it is recommended to clean the panels when dirt can clearly be seen on the glass surface.

Using a soft rubber squeegee, wipe the panel surface from the top downwards to remove any residual water from the panel glass. Take care not to 

scratch the surface or introduce foreign elements that may cause damage to the panel. Always rinse the panel with plenty of water. Panels can be 

left to dry in the air or wiped dry with a clean and soft cloth or chamois. 
For more information on cleaning REC solar panels, consult the 

REC Cleaning Information Sheet which is available to download from the online REC 

Download Center www.recgroup.com/downloads. If in doubt at any time when cleaning the panels, stop and obtain professional advice.

SYSTEM INSPECTION

The system should be inspected regularly to ensure that: 

•  Fasteners are secure, tight and free from corrosion,
•  Electrical connections are secure, tight, clean and free of corrosion,
•  The mechanical integrity of the cables is intact,
•  Bonding points to ground are tight, secure and free from corrosion (which could break the continuity between the panels and ground).

RECYCLING 

REC makes every effort to ensure panel packaging is kept to a minimum. Please check local recycling capability. The paper and cardboard packaging 

can be recycled and the protective wrapping and panel separating blocks are also recyclable in many areas. Recycle packaging and panels according 

to local guidelines and regulations.

DISPOSAL OF OLD ELECTRICAL AND ELECTRONIC EQUIPMENT

Panels should be recycled at the end of their useful life according to local guidelines and regulations. By ensuring REC solar panels are disposed of 

correctly, you will help prevent any negative impact on the environment and human health. The majority of the panel components can be recycled.
For installations in the European Union, REC solar panels are subject to WEEE regulations. The symbol in fig. 16 as found on the label on the rear 

of the panel indicates that this product must not be treated as household waste and must be disposed of at an appropriate collection point for the 

recycling of electrical and electronic equipment. The recycling of the different components and materials will help to conserve natural resources.

Fig. 16: WEEE symbol

The European WEEE (Waste Electrical and Electronic Equipment) Directive regulates the correct recycling of electronic and electrical 

waste in all member states of the European Union (EU). For end-customers it is a free of charge disposal system, financed by the 

manufacturers and importers, where panels can be brought to a local recycling depot, or in the case of larger numbers, be picked up from 

site, as is the case with other electrical equipment, e.g., refrigerators or televisions. The extensive process steps for proper disposal are 

strictly regulated and place no further obligations on the owner of the panels. For more information about the recycling of this product, 

please contact your local recycling authority or recycling center.

CAUTION

•  Panel cleaning must always be carried out when the panels are cool, e.g., early morning, to avoid breakage through thermal shock.
•  Use of high pressure hoses or cleaners is not permitted as these may damage the panels, laminate or cells.

NOTE

•  Avoid putting pressure on the on the panel surface when cleaning or drying, e.g., leaning, standing or resting buckets on it.
•  Use only deionized water free from grit and physical contaminants, at ambient temperature and use a sponge, microfiber cloth or a soft 

brush to wipe away the dirt (rainwater, tap water or diluted alcohol may also be used as a secondary solution). 

•  For further cleaning a mild, biological and biodegradable washing-up liquid may be used.
•  If stains require more effort to be removed, Isopropyl alcohol of a concentration less than 10% may be used. Acidic or alkaline detergent may 

not be used.

i

Summary of Contents for Alpha Pure Series

Page 1: ...FOR ALL REC ALPHA SOLAR PANELS CERTIFIED ACCORDINGTO IEC 61215 IEC 61730 STANDARDS rec Alph panels Installation Manual REC Alpha Pure Series REC Alpha Pure R Series Rev 13 11 22...

Page 2: ...ure Series panels with short rails 11 Installation of REC Alpha Pure R Series panels 12 Mounting with continous rails parallel to short side of the panel 12 Mounting REC Alpha Pure R Series panels wit...

Page 3: ...o short side of the panel 12 Fig 7 Clamping of REC Alpha Pure R Series panels with rails parallel to long side of the panel 13 Fig 8 Clamping of REC Alpha Pure R Series panels using short rails 14 Fig...

Page 4: ...nly qualified personnel must perform work on photovoltaic systems such as installation commissioning maintenance and repairs Be sure to follow the safety instructions for all system components Ensurin...

Page 5: ...served during handling to avoid the risk of sparking fire hazards burns and lethal electric shocks Exercise extreme caution when wiring panels and look out for damaged or dirty cables etc Never insert...

Page 6: ...rdegradationtothepackagingorpanelcomponents pallets and panels must be stored in a controlled environment ideally internal where it is protected from the elements e g rain dust and direct sunlight If...

Page 7: ...age Voc and short circuit current Isc deviate from specification this may indicate a configuration fault Correct DC polarity must be observed at all times Electrical Ratings Electricalratingsarewithin...

Page 8: ...o the manufacturer s instructions including specific hardware and torque requirements Ensure the clamps used are suitable for the planned installation and expected system design loads The grip area mu...

Page 9: ...Pa 2400Pa 2400Pa 1600Pa 1600Pa X 255 375 mm 1800Pa 1800Pa 1200Pa 1200Pa 4200Pa 2400Pa 2800Pa 1600Pa 5400Pa 2400Pa 3600Pa 1600Pa X 375 505 mm 1800Pa 1800Pa 1200Pa 1200Pa 6200Pa 4000Pa 4133Pa 2666Pa 700...

Page 10: ...PANELS WITH CONTINOUS RAILS PARALLEL TO LONG SIDE OF THE PANEL A continous rail or other support structure spans the complete underside of the panel Legend Clearance Gap Clamping zone 20 40 mm 40 60 m...

Page 11: ...2400Pa 3000Pa 1600Pa X 375 505 mm 1200Pa 1200Pa 800Pa 800Pa 3000Pa 3000Pa 2000Pa 2000Pa 4200Pa 4000Pa 2800Pa 2666Pa X 505 610 mm 1200Pa 1200Pa 800Pa 800Pa 2400Pa 2400Pa 1600Pa 1600Pa 3600Pa 2400Pa 240...

Page 12: ...800Pa 1800Pa 1200Pa 1200Pa 6200Pa 3000Pa 4133Pa 2000Pa 7000Pa 3000Pa 4666Pa 2000Pa 520 570 mm 1200Pa 1200Pa 800Pa 800Pa 3000Pa 2400Pa 2000Pa 1600Pa 5400Pa 2400Pa 3600Pa 1600Pa 570 730 mm 2400Pa 2400Pa...

Page 13: ...other support structure spans the complete underside of the panel Legend Clearance Gap Clamping zone 20 40 mm 40 60 mm 60 mm Test Load DesignLoad Test Load DesignLoad Test Load DesignLoad 90 730 mm 1...

Page 14: ...0Pa 800Pa 2400Pa 2400Pa 1600Pa 1600Pa 3600Pa 2400Pa 2400Pa 1600Pa 570 730 mm 1200Pa 1200Pa 800Pa 800Pa 1600Pa 1600Pa 1066Pa 1066Pa 2400Pa 2400Pa 1600Pa 1600Pa 0 200 mm X 800Pa 800Pa 533Pa 533Pa 800Pa...

Page 15: ...apply a safety factor of 1 5 to the stated test load e g test load 5400 Pa 1 5 3600 Pa design load Part Name Material Rail 6105 T5 aluminum extrusion Bolt M6 x 25 drop inT stud kit Nut M6 flanged hex...

Page 16: ...pport structures must be used to secure the panel The center point of each clamp and the minimum grip length must be fully located within the marked zone to be rated to the given value fig 12 Legend C...

Page 17: ...used to secure the panel The center point of each clamp and the minimum grip length must be fully located within the marked zone to be rated to the given value fig 13 Legend Clearance Gap Clamping zo...

Page 18: ...t side as shown in fig 12 and can be further identified by the grounding symbol stamped in the frame next to it Check all applicable requirements before beginning installation Suitable grounding clips...

Page 19: ...coveranyfaulttraceabletothereplacedconnectors Anyothermodificationtothepanelisprohibited includingthe openingofthejunctionbox unlessexplicitlyauthorizedbyREC Doingsowillinvalidatethewarranty CABLEMANA...

Page 20: ...ng to local guidelines and regulations By ensuring REC solar panels are disposed of correctly you will help prevent any negative impact on the environment and human health The majority of the panel co...

Page 21: ...0 04 C The temperature coefficients stated are linear values CERTIFICATIONS IEC 61215 2016 IEC 61730 2016 UL 61730 IEC 62804 PID IEC 61701 Salt Mist IEC 62716 Ammonia Resistance ISO 11925 2 Ignitabili...

Page 22: ...IMUM RATINGS Operational temperature 40 85 C System voltage 1000V Test load front 7000Pa 713 kg m Test load rear 3000Pa 305 kg m Series fuse rating 25A Reverse current 25A See installation manual for...

Page 23: ...slack to prevent damage due to water level changes and wave motions ii Mounting panels Installation of REC solar panels must be in accordance with the aforementioned standard mounting instructions Th...

Page 24: ...n MLPE device directly to the solar panel frame follow the MLPE manufacturer s instructions to ensure optimum mounting of the device and prevent any slippage during operation WheninstallinganMLPEdevic...

Page 25: ...of the laws of the Member States relating to the making available on the market of electrical equipment designed for use within certain voltage limits The technical documentation and full compliance...

Page 26: ...tage limits The technical documentation and full compliance with the standards listed below proves the conformity of the product with the requirements of and conformity with the Electrical Equipment S...

Page 27: ...ddition of REC Alpha 72 Series 03 2021 6 Updated Datasheets 06 2021 7 Addition of REC Alpha Pure Series 11 2021 8 Updated Datasheets 03 2022 9 Added six point clamping and added requirement for washer...

Page 28: ...RECSOLARPTE LTD 20TUASSOUTHAVENUE14 SINGAPORE637312 SINGAPORE Tel 6564959228 Mail post recgroup com www recgroup com...

Reviews: