Fan module outlet
connection
Cut tube to length where
required. Ensure ends
are burr free and round,
test fit flue will slide over
connection.
Slide flue onto connection
spigot fully.
Tighten clamp fully.
Wipe excess silicon,
visually check connection
to ensure connection is
fully sealed.
Apply an 8mm thick silicon
bead fully around heater
connection approx. 10mm
from the top.
Apply an 8mm silicon
bead fully around the
inside of the flue end
(heater connection end)
Fit flue clamp over flue
(loosely).
Repeat for air intake flue
connection.
Repeat for connection to underside of fan module.
6. Connect power
lead to fan module.
Ensure lead is clipped
to support where
required.
Do not use connection to
support lead.
Slide flue onto connection
spigot fully.
Tighten clamp fully.
Wipe excess silicon,
visually check connection
to ensure connection is
fully sealed
Summary of Contents for Element 1200 MARK 2
Page 6: ...6 Page OPERATION INSTRUCTIONS ...
Page 20: ...20 Page IN STALL ATION INSTRUCTIONS ...
Page 26: ...26 Page 0 5M FLUE CONFIGURATION ...
Page 30: ...30 Page Flue runs 0m to 5m length rooftop termination with external motor ...
Page 34: ...34 Page 0M 5M FLUE INTERNAL FAN AND WALL TERMINATION INSTALL ATION ...
Page 42: ...42 Page INTERNAL FAN ROOF TERMINATION ...
Page 46: ...46 Page ROOFTOP TERMINATION WITH EXTERNAL MOTOR ...
Page 49: ...49 Page 5 10M INSUL ATED FLUE CONFIGURATION ...
Page 77: ...77 Page 10 13 5M POLYPROPYLENE FLUE CONFIGURATION ...
Page 81: ...81 Page ...
Page 89: ...89 Page Connect power cable connector Fit cable clamp to cable Fit front cover ...
Page 98: ...98 Page 10 13 5M ROOFTOP POLYPROPYLENE FLUE CONFIGURATION ...
Page 102: ...102 Page ...
Page 103: ...103 Page SET UP WITH IN LINE OR APPLIANCE MOUNTED FAN ...