SECTION N: INITIAL START-UP
1.0
TOOLS NEEDED
•
One 12-0-12, 24” scale manometer
•
Two 6-0-6, 12” scale manometers
•
7/16” open end wrench
•
1/2” open end wrench
•
Screwdriver
•
Volt meter
•
3/16” Allen wrench
2.0
PREPARATION FOR START-UP
WARNING:
DO NOT TURN ON GAS AT THIS TIME
2.1
Check Power Supply
With volt meter at incoming power check voltage between:
Hot - Common
(
~
120 VAC)
Hot - Ground
(
~
120 VAC)
Common - Ground
(< 1 VAC)
If Common - Ground is > 1 VAC -
STOP:
Contact electrician to correct ground failure. Warning: Failure to do this may
burn out 120V-24V transformer, or may cause other safety control damage or failure.
2.2
Attach Manometers to Measure Pressures
•
Attach 24" scale manometer to the first main gas shut-off valve pressure tapping.
•
Attach one 12" scale manometer to the manifold gas pressure tapping. (See gas valve detail on page 7.)
•
Attach one 12" scale manometer to — Pull rubber tube from air pressure switch off the aluminum tubing and
connect the manometer using a tee.
Turn Off Main Gas Valve;
2.3
Check the Gas Supply Pressure
1.
Slowly turn on main gas shut-off valve.
2.
Read the gas supply pressure from the manometer; minimum supply pressure is 5” W.C., recommended supply is
7” W.C. for natural gas (minimum 12” W.C. for LP gas).
3.
If pressure is > 14" W.C., turn off the valve.
4.
Check if the service regulator is installed and/or adjust the service regulator.
44
Summary of Contents for 122-322
Page 6: ...HI DELTA COMPONENT LOCATION 6 BACK LEFT SIDE FRONT See detail page 7 See detail page 7 ...
Page 7: ...7 General Information GasValve Detail Air Shutter Adjustment ...
Page 17: ...17 SINGLE HEATER DOMESTIC HOTWATER WITH ONE STORAGE TANK ...
Page 35: ...DIRECT VENT Vertical Venting Category I VERTICALVENTINGTABLE 35 SECTION J 4 ...
Page 41: ...41 WIRE DIAGRAM MODELS 122 322 Reference Drawing Number M152564C ...
Page 50: ...Fig 241093 50 ...
Page 51: ...51 HEATEXCHANGERDETAIL ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ......