which may be used as temporary locking nuts to aid insertion
of the studs into the pedestal.
If the supplied studs are not long enough for the mounting
surface thickness, use M10 stainless steel, grade A4-70 studding
of a suitable length.
10. Using suitable lifting equipment (such as a rope or chain)
attached to the lifting eyes, raise the pedestal over the mounting
surface. Carefully lower into position, taking care that the studs
pass through the holes without damaging the threads. Ensure
that the front of the pedestal is pointing towards the bow of the
vessel.
D10493-2
11. Grease the studs with the supplied Denso paste.
Location and mounting
37
Summary of Contents for VCM100
Page 2: ......
Page 4: ......
Page 40: ...40 HD and SuperHD Digital Open Array Installation instructions ...
Page 57: ......
Page 58: ...www raymarine com ...