Note:
Drill bit, tap size and tightening torque is dependent on the thickness and type of material the unit
is to be mounted on.
Mounting the wireless hub
Before mounting, ensure that:
• your selected location meets the location requirements found in this document.
• you pay particular attention to the wireless location requirements.
• sufficient space is available above or to one side of the hub for the antenna.
• the product operates correctly at the desired location before mounting.
1. Using the supplied mounting template, mark the location of the fixing holes on the mounting
surface.
2. Drill holes for the mounting fixings using a drill with a suitable sized drill bit.
3. Screw the fixings approximately half way into the holes in the mounting surface.
4. Place the Wireless hub over the fixing screws and push down to lock into positions
5. Fully tighten the screws.
6. Connect the antenna to the top of the hub.
41
Summary of Contents for Ray 90
Page 2: ......
Page 4: ......
Page 44: ...44...
Page 92: ...92...
Page 127: ...Menu Description Options Flybridge Mast Group 1 to Group 5 VHF operations 127...
Page 128: ...128...
Page 134: ...134...
Page 135: ...Chapter 10 Maintenance Chapter contents 10 1 Maintenance on page 136 Maintenance 135...
Page 152: ...152...
Page 164: ...164...
Page 190: ......
Page 191: ......