![Raymarine Ray 90 Installation And Operation Instruction Manual Download Page 36](http://html2.mh-extra.com/html/raymarine/ray-90/ray-90_installation-and-operation-instruction-manual_3941641036.webp)
3.4 Mounting
Tools required for installation
1.
Power drill
2. Pozi-drive screwdriver
3.
Adhesive tape
4.
Suitable size drill bit
5. 89 mm (3
½
in) Hole saw (used for speaker mounting)
6. File (for speaker cut-out)
Mounting the Base station
Before mounting, ensure that your selected location meets the location requirements found in
this document.
• Also ensure you have planned the location for any additional components, such as the Handset
or Speaker etc.
36
Summary of Contents for Ray 90
Page 2: ......
Page 4: ......
Page 44: ...44...
Page 92: ...92...
Page 127: ...Menu Description Options Flybridge Mast Group 1 to Group 5 VHF operations 127...
Page 128: ...128...
Page 134: ...134...
Page 135: ...Chapter 10 Maintenance Chapter contents 10 1 Maintenance on page 136 Maintenance 135...
Page 152: ...152...
Page 164: ...164...
Page 190: ......
Page 191: ......