4.1 EV-2 Installation
Location requirements — EV–1 and EV–2
The installation location must take into account the following
requirements:
• Install above or below decks.
• Mount on a horizontal and level surface. The unit may be
mounted upright or upside-down, but the back and front of the
unit must be level within 5º of pitch and 5º of roll (compared
with the vessel’s neutral position when at rest and normally
loaded).
• Install flat on a deck, or mounted to a bulkhead, mast or other
vertical surface, using the supplied bracket to fit and orient the
unit horizontally.
• Location must be at least 1 m (3 ft.) away from any source
of magnetic interference, such as compasses and electrical
cables.
• Safe from physical damage and excessive vibration.
• Away from any source of heat.
• Away from any potential flammable hazard, such as fuel
vapors.
• Must be mounted with the arrow on the top of the unit in
parallel alignment with the vessel’s longitudinal axis. Position
the arrow on the unit facing forward in the direction of the
arrows shown in the following illustration:
D12689-1
1
1
0
0
0
1.
Vessel’s longitudinal axis.
Dimensions — EV–1 and EV–2
D12691-1
95
m
m
(
3.
8
in
)
128 mm (5.0 in)
35
m
m
(
1.
4
in
)
Deck mounting the EV-2
Important:
The installation must only be performed with the
vessel either on hard standing, or tied-up alongside a pontoon
or berth.
4
5
6
0
1
D12767-1
2
3
1. Use the supplied deck mounting template to drill 4 holes in
the mounting surface, plus holes of a suitable size for each of
the SeaTalk
ng
and DeviceNet cables. Affix the small sealing
ring to the groove located on the bottom of the mounting tray.
2. Affix the tray to the mounting surface and secure using the
supplied screws in the 4 positions indicated in the above
illustration.
3. Affix the large sealing ring into the groove on the upper side
of the mounting tray.
4. Pull the SeaTalk
ng
and DeviceNet cables through the
mounting surface hole and the mounting tray. Insert the
plugs into the EV-2 unit.
5. Secure the EV-2 unit to the mounting tray by positioning
and inserting carefully in alignment with the grooves in the
mounting tray.
Important:
The EV-2 unit must be mounted with the arrow
on the top of the unit in parallel alignment with the vessel’s
longitudinal axis.
6. Place the EV-2 mounting trim over the EV-2 unit and push
the trim together with the mounting tray until the 2 items click
into position.
Bracket mounting the EV-2
Important:
The installation must only be performed with the
vessel either on hard standing, or tied-up alongside a pontoon
or berth.
26
Evolution EV-2
Summary of Contents for Evolution EV-2
Page 2: ......
Page 4: ......
Page 6: ...6 Evolution EV 2...
Page 32: ...32 Evolution EV 2...
Page 36: ...36 Evolution EV 2...
Page 40: ...40 Evolution EV 2...
Page 41: ......
Page 42: ...www raymarine com...