Supplied By www.heating spares.co Tel. 0161 620 6677
12
6.5.2
Take out from the Energycatcher valve pack the blue
isolation valve and connect it to a 15 mm pipework
(not supplied) making sure compression connection
is water tightened. length of pipe approx 120 cm.
- Clip the pipe into backframe right side clips.
- Connect cold mains inlet and locate in clips leaving
more than 100 mm above top backframe so this
can be connected to the cold inlet later.
Note:
It may be necessary to slacken backrame from the
wall to locate pipes in clips.
6.6
Unpack and prepare the selected boiler for
installation as set out in the main boiler manual.
6.7
Remove the straight exhaust white header and
gasket from the top of the boiler by removing the 4
screws located on the top of the boiler itself.
Fig. 6.
Fig. 7
6.8
Lift up the boiler onto the 2 lower backframe bolts
and locate tighten them to secure boiler to
backframe.
Fig. 4.
6.9
Remove boiler front cover by removing lower 2
screws on bottom of cover slide up the front panel
to dislocate it from studs.
Fig. 7
.
Fig. 6
Fig. 5
Summary of Contents for Energycatcher
Page 2: ...Supplied By www heating spares co Tel 0161 620 6677...
Page 7: ...Supplied By www heating spares co Tel 0161 620 6677 7 Section 2 GENERAL LAYOUT Fig 1...
Page 16: ...Supplied By www heating spares co Tel 0161 620 6677 16 10 5 WITH REMOTE STORAGE TANK Fig 12...
Page 17: ...Supplied By www heating spares co Tel 0161 620 6677 17 Fig 13...
Page 21: ...Supplied By www heating spares co Tel 0161 620 6677 21...