THE WHITE BOILER COMPANY
$
ll installations in
(
ngland and
:
ales must be noti
¿
ed to
/
ocal
$
uthority
%
uilding Control (
/$%
C) either directly or through a
Competent
3
ersons
6
cheme.
$
%
uilding
5
egulations Compliance Certi
¿
cate will then be issued to the customer.
www.centralheating.co.u
N
© Heating and Hotwater Industry Council (HHIC)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
)
ailure to install and commission according to the manufacturer
¶
s instructions and complete this
%
enchmar
N
Commissioning Chec
N
list will in
Y
alidate the
warranty.
7
his does not affect the customer
¶
s statutory rights.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
Customer name
7
elephone number
$
ddress
%
oiler ma
N
e and model
%
oiler serial number
Commissioned by (
35
I
17
1$0(
)
*
as
6
afe register number
Company name
7
elephone number
Company address
Commissioning date
To be completed by the customer on receipt of a Building Regulations Compliance Certi
¿
cate
%
uilding
5
egulations
1
oti
¿
cation
1
umber (if applicable)
CONTROLS
(tic
N
the appropriate bo
[
es)
7
ime and temperature control to heating
5
oom thermostat and programmer
timer
3
rogrammable room thermostat
/
oad
weather compensation
Optimum start control
7
ime and temperature control to hot water
Cylinder thermostat and programmer
timer
Combination
%
oiler
Heating
]
one
Y
al
Y
es
Fitted
1
ot required
Hot water
]
one
Y
al
Y
es
Fitted
1
ot required
7
hermostatic radiator
Y
al
Y
es
Fitted
1
ot required
$
utomatic bypass to system
Fitted
1
ot required
%
oiler interloc
N
3
ro
Y
ided
ALL SYSTEMS
7
he system has been
À
ushed and cleaned in accordance with
%6
and boiler manufacturer
¶
s instructions
Yes
:
hat system cleaner was used
"
:
hat inhibitor was used
"
4
uantity litres
Has a primary water system
¿
lter been installed
"
Yes
1
o
CENTRAL HEATING MODE
measure and record
*
as rate
m
ñ
hr
OR
ft
ñ
hr
%
urner operating pressure (if applicable)
mbar
OR
*
as inlet pressure
mbar
Central heating
À
ow temperature
C
Central heating return temperature
C
COMBINATION BOILERS ONLY
Is the installation in a hard water area (abo
Y
e
ppm)
"
Yes
1
o
If yes
and if required by the manufacturer
has a water scale reducer been
¿
tted
"
Yes
1
o
:
hat type of scale reducer has been
¿
tted
"
DOMESTIC HOT WATER MODE
0
easure and
5
ecord
*
as rate
m
ñ
hr
OR
ft
ñ
hr
%
urner operating pressure (at ma
[
imum rate)
mbar
OR
*
as inlet pressure at ma
[
imum rate
mbar
Cold water inlet temperature
C
Hot water has been chec
N
ed at all outlets
Yes
Temperature
C
:
ater
À
ow rate
I
min
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer
¶
s instructions and
or
%6%6
Yes
ALL INSTALLATIONS
5
ecord the following
$
t ma
[
. rate
CO ppm
AND
CO
CO²
Ratio
$
t min. rate
(where possible)
CO ppm
AND
CO
CO²
Ratio
The heating and hot water system complies with the appropriate
%
uilding Regulations
Yes
The boiler and associated products ha
Y
e been installed and commissioned in accordance with the manufacturer
¶
s instructions
Yes
The operation of the boiler and system controls ha
Y
e been demonstrated to and understood by the customer
Yes
The manufacturer
¶
s literature
including
%
enchmar
N
Chec
N
list and
6
er
Y
ice Record
has been e
[
plained and left with the customer
Yes
Commissioning
(
ngineer
¶
s
6
ignature
Customer
¶
s
6
ignature
(To con
¿
rm satisfactory demonstration and receipt of manufacturer
¶
s literature)
www.centralheating.co.u
N
Summary of Contents for CS 80 T
Page 2: ...2 ...
Page 21: ...21 4 10 FLUE TERMINAL POSITION ...
Page 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 56 ...
Page 55: ...55 11 SPARE PARTS Fig 57 ...
Page 61: ...61 ...
Page 62: ...62 ...
Page 64: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER ...
Page 65: ...65 12 1 ANALYSER CHECK LIST ...