38
8)
Verify that each Boom ON/OFF Valve operates and that no nozzles are plugged by operating
BOOM ON/OFF switches.
9)
Enter a SELF TEST speed equal to that of normal operating speed, verify entry by depressing
SPEED (6 MPH [9.6 km/h] is recommended). (See "SELF TEST FEATURE").
10)
Place all BOOM ON/OFF switches to ON, the carrier PRODUCT display should show a reading.
11)
Hold the carrier PRODUCT INC/DEC switch in INC position for approximately 12 seconds. This
assures that the motorized Control Valve is fully open. Verify maximum pressure and carrier
PRODUCT rate. (Pressure gauge is not supplied)
NOTE:
A pressure gauge MUST be installed to properly monitor the system.
12)
Adjust agitator line hand valve for desired agitation. Verify maximum pressure is still present.
13)
Hold the carrier PRODUCT INC/DEC switch in DEC position for approximately 12 seconds.
This assures motorized Control Valve is fully closed. Verify minimum pressure and carrier
PRODUCT rate can be achieved. If not, consider increasing application rate of carrier or
changing type of Control Valve. Consult a Raven Dealer.
NOTE:
It is recommended that PRODUCT 1 be used for a Carrier.
2.
INITIAL CARRIER FIELD TEST
1)
Drive down field or road at target speed with sprayer booms OFF to verify speed readout on
Console.
2)
Turn on Sprayer pump and booms, place the carrier PRODUCT OFF/MAN/AUTO switch to
AUTO. Increase or decrease speed by one MPH [2 km/h], the system should automatically
correct to the target application rate.
3)
If, for any reason, the system is unable to correct to the desired GPA [lit/ha], check for an empty
tank, a plugged line, a malfunctioning pump, improper vehicle speed, or a defect in the system.
4)
If the system does not appear to be correcting properly, review "INITIAL CARRIER SET-UP".
5)
At the end of each row, switch the MASTER ON/OFF switch to OFF to shut off flow. This also
shuts off the area totalizer.
6)
Verify area covered and volume used.
3.
INITIAL INJECTION SET-UP
1)
Fill Injection Module Tank with water.
2)
Place the 3-way valve handle on Injection Pump to the "injection" position (See Figure 9C).
Summary of Contents for SCS 700
Page 1: ...Installation Service Manual SCS 700 ...
Page 3: ......
Page 4: ... ...
Page 58: ...54 APPENDIX 9 INJECTION MODULE MOUNTING INSTRUCTIONS 1 TYPICALMODULEDIAGRAM ...
Page 64: ...60 APPENDIX 14 SCS 710 6 BOOM CONSOLE WIRING DIAGRAM ...
Page 69: ......
Page 70: ......