1
TABLE OF CONTENTS
SYMBOL DEFINITION ................................................................................................................................ 3
INTRODUCTION ........................................................................................................................................ 4
SECTION 1 - LIQUID AND GRANULAR APPLICATIONS ..................................................................... 6
INSTALLATION ........................................................................................................................................... 7
1. MOUNTING THE FLOW METER AND OPTIONAL PRESSURE TRANSDUCER (Liq. Apps) 7
3. MOUNTING THE CONTROL VALVE (Liquid Applications) ....................................................... 8
3. MOUNTING THE CONSOLE AND CABLING ............................................................................ 9
BATTERY CONNECTIONS ..................................................................................................................... 10
CONSOLE FEATURES ........................................................................................................................... 11
CONSOLE CALIBRATION ....................................................................................................................... 12
1. CALCULATING "BOOM CAL" (Liquid Applications) ................................................................ 12
2. CALCULATING "SPEED CAL" ................................................................................................. 13
3. CALCULATING "METER CAL" (Liquid Applications) ............................................................... 13
4. CALCULATING "VALVE CAL" .................................................................................................. 14
5. CALCULATING "RATE CAL" (Liquid Applications) .................................................................. 15
CONSOLE PROGRAMMING .................................................................................................................. 16
1. INITIAL CONSOLE PROGRAMMING ....................................................................................... 16
2. OTHER DISPLAY FEATURES ................................................................................................ 19
3. SELF TEST FEATURE ............................................................................................................ 20
4. DECIMAL SHIFT ....................................................................................................................... 20
5. DATA MENU ............................................................................................................................. 22
6. ALARMS DEFINITION .............................................................................................................. 26
7. DATA LOGGER ....................................................................................................................... 27
SCS 4600 WITH GUIDANCE SYSTEM DRAWING ................................................................................. 29
INITIAL SYSTEM SET-UP ........................................................................................................................ 30
INITIAL SYSTEM FIELD TEST ................................................................................................................. 31
PREVENTIVE MAINTENANCE ................................................................................................................. 31
SECTION 2 - GRANULAR APPLICATIONS .......................................................................................... 32
SCS 4600 SYSTEM DRAWING ............................................................................................................... 33
INSTALLATION ......................................................................................................................................... 34
1. MOUNTING THE ENCODER .................................................................................................. 34
2. MOUNTING THE HYDRAULIC CONTROL VALVE ................................................................ 35
CONSOLE CALIBRATION ....................................................................................................................... 36
1. CALCULATING "BOOM CAL" ................................................................................................. 36
2. CALCULATING "SPREADER CONSTANT" ........................................................................... 36
3. CALCULATING "METER CAL" ................................................................................................ 37
4. CALCULATING "RATE CAL" ................................................................................................... 37
5. CONTROLLING SPINNER RPM ............................................................................................ 37
INITIAL SYSTEM SET-UP ........................................................................................................................ 38
INITIAL SYSTEM FIELD TEST ................................................................................................................. 38
SECTION 3 - CONTROLLER AREA NETWORK (CAN) ..................................................................... 40
INTRODUCTION ...................................................................................................................................... 41
PROCEDURE TO READDRESS CAN PRODUCT CONTROL NODES .............................................. 41
SYSTEM DRAWINGS .............................................................................................................................. 42
TROUBLESHOOTING GUIDE .............................................................................................................. 45
Raven Part Number
016-0159-924
02/04 REV B
Summary of Contents for SCS 4600
Page 1: ...Operators Manual SCS 4600 SCS 4600 SCS 4600 SCS 4600 SCS 4600...
Page 10: ...5 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 11: ...6 SECTION 1 LIQUID AND GRANULAR APPLICATIONS LIQUID AND GRANULAR APPLICATIONS...
Page 15: ...10 FIGURE 3 BATTERY CONNECTIONS LIQUID AND GRANULAR APPLICATIONS...
Page 34: ...29 FIGURE 6...
Page 37: ...32 GRANULAR APPLICATIONS SECTION 2 GRANULAR APPLICATIONS...
Page 38: ...33 FIGURE 7...
Page 44: ...39 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 45: ...40 CAN APPLICATIONS SECTION 3 CONTROLLER AREA NETWORK CAN...
Page 47: ...42 CAN APPLICATIONS FIGURE 13 FIGURE 14...
Page 48: ...43 FIGURE 15...