P/N 016-0171-675 Rev. A
35
INSTALLATION
CHASSIS HARNESS INSTALLATION
1. Locate the fuse box in the front left corner of the spray skid.
FIGURE 44. Fuse Box
2. Route the power wire from the injection chassis harness (P/N 115-2500-016) into the bottom of the fuse box.
3. Install the supplied 70 amp fuse and secure top with supplied nut.
4. Install the power wire on the bottom stud and secure with the supplied nut.
5. Locate the skid ground stud.
FIGURE 45. Ground Stud Location
6. Install the ground wire on the stud.
7. Route and secure the chassis cable to the rear of the machine along the left side of the skid frame.
IMPORTANT:
Do not secure the cable to the machine chassis to prevent damage if the skid is removed.
8. Locate the machine’s logic power and CAN connections along the left rear corner of the sprayer skid.
70 Amp Fuse
Ground Stud
Locations
Summary of Contents for ICD Sidekick Pro
Page 48: ...CHAPTER 5 44 ICD Sidekick Pro Injection for Case Trident Installation Manual ...
Page 57: ...P N 016 0171 675 Rev A 53 SYSTEM DIAGRAMS ...
Page 58: ...CHAPTER 6 54 ICD Sidekick Pro Injection for Case Trident Installation Manual ...
Page 60: ...INDEX 56 ICD Sidekick Pro Injection for Case Trident Installation Manual ...