CHAPTER
4
P/N 016-0171-655 Rev. D
15
CHAPTER 4
NOZZLE CONTROL VALVE
INSTALLATION
HAWKEYE NOZZLE CONTROL VALVE INSTALLATION
After rinsing the debris out of the plumbing, mount the Hawkeye
®
nozzle control valves to the existing nozzle
bodies.
BEST PRACTICES AND RECOMMENDATIONS
• Do not connect battery leads until all cables are installed and connected.
• If a dual channel turret nozzle body is installed on the implement, always mount the Hawkeye
®
nozzle control
valve to the straight nozzle port to avoid excessive pressure drop across the nozzle.
• If there are obstacles that interfere with the Hawkeye
®
valve installation it may be necessary to purchase a
different brand of nozzle body with a threaded port on the opposite side.
GENERAL VALVE INSTALLATION
FIGURE 1. Valve Face O-Ring and Nozzle Control Valve
1. Place the supplied O-ring on the inside of the fly nut flush with the valve body face.
NOTE:
If using TeeJet QJS (straight) nozzle bodies, use the green coated (size 115) O-ring. For AGCO Hypro
nozzle bodies, use the green coated (size 115) O-ring. For TeeJet QJ (turret) nozzle bodies, use the
brown/gray (size 116) O-rings.
Valve Body Face O-Ring
Nozzle
Body
Summary of Contents for Hawkeye
Page 18: ...CHAPTER 3 14 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Page 28: ...CHAPTER 4 24 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Page 34: ...CHAPTER 5 30 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Page 39: ...P N 016 0171 655 Rev D 35 CHASSIS CABLE INSTALLATION FIGURE 6 System Diagram Page 2 ...
Page 40: ...CHAPTER 6 36 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Page 44: ...APPENDIX A 40 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Page 48: ...APPENDIX B 44 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Page 52: ...Index 48 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...