![background image](http://html1.mh-extra.com/html/raven/agco-rogator-hawkeye-c-series/agco-rogator-hawkeye-c-series_installation-manual_3838097027.webp)
CHAPTER
4
Nozzle Body and Nozzle Control Valve Installation: Hawkeye® 2 Nozzle Body Installation
23
CHAPTER 4
NOZZLE BODY AND NOZZLE
CONTROL VALVE
INSTALLATION
HAWKEYE® 2 NOZZLE BODY INSTALLATION
After completing the steps in Chapter 3,
Installation Preparation
, install the provided nozzle bodies and nozzle
control valves.
BEST PRACTICES AND RECOMMENDATIONS
• Do not connect battery leads until all cables are installed and connected.
• If a dual outlet nozzle body is installed on the boom, always mount the Hawkeye® 2 nozzle control valve to the
closest port to the boom tube to avoid higher stress on the nozzle body.
HYPRO NOZZLE BODY INSTALLATION
NOTE:
For some Hypro
kits, the standard Hypro nozzle bodies will need to be replaced with left-handed
versions of the 5-way nozzle body in order to prevent interferences with the NCV2.
FIGURE 1. Valve Face O-Ring and Nozzle Control Valve Installed
1. Locate included Hypro 5-way, left-handed nozzle bodies in the kit.
Valve Body Face O-Ring
(Place O-Ring Here)
Nozzle Body
Purple O-Ring
Summary of Contents for AGCO RoGator Hawkeye C Series
Page 8: ...CHAPTER 1 4 Hawkeye 2 Installation Manual for AGCO RoGator C Series RG900 RG1100 RG1300...
Page 24: ...CHAPTER 2 20 Hawkeye 2 Installation Manual for AGCO RoGator C Series RG900 RG1100 RG1300...
Page 26: ...CHAPTER 3 22 Hawkeye 2 Installation Manual for AGCO RoGator C Series RG900 RG1100 RG1300...
Page 52: ...CHAPTER 6 48 Hawkeye 2 Installation Manual for AGCO RoGator C Series RG900 RG1100 RG1300...
Page 56: ...CHAPTER 7 52 Hawkeye 2 Installation Manual for AGCO RoGator C Series RG900 RG1100 RG1300...
Page 60: ...APPENDIX A 56 Hawkeye 2 Installation Manual for AGCO RoGator C Series RG900 RG1100 RG1300...
Page 62: ......