7700-M002-3
GB
ASSEMBLING AND USE
INSTRUCTIONS
Page 14 of 22
PLUS91S - PLUS91N
PLUS91SE - PLUS91SA - G800A69
Fig. 26
d - Place the rotary bead depressing unit (
Fig. 25 pos.
1
) again at about 120° from the machine-head axis
(as in figure) and lower the tyre positioning the lever
(
Fig. 25 pos. A
) of the control unit downwards, until
the tyre bead is placed in correspondence of the rim
groove.
e - Load the bead of the tyre by using the appropriate
lever (
Fig. 25 pos. 3
) on the head (
Fig. 25 pos. 2
).
Fig. 25
f - Lift the Device plus and close it to its rest position as
shown in figure (
Fig. 26 pos. 1
).
g - Carry out the extraction of the first bead by rotating
clockwise the chuck (
Fig. 26 pos. 2
).
b - Insert the bead lifting lever (
Fig. 24 pos. 2
) between
the tyre (
Fig. 24 pos. 4
) and the head (
Fig. 24 pos. 3
).
c - Lift the roll of the rotary bead depressing unit (
Fig.
24 pos. 1
) of the Plus device lifting the lever (
Fig. 24
pos. A
).
Fig. 23
Fig. 24