4
0483-M002-1
INDICE
CONTENTS
INHALTSVERZEICHNIS
0.
NORME GENERALI DI SICUREZZA
1.
DISPOSITIVI DI SICUREZZA
1.1 INTERRUTTORE
GENERALE
LUCCHETTATO
1.2 SISTEMA A UOMO PRESENTE
1.3 DISPOSITIVO CONTRO LA DISCESA
ACCIDENTALE
1.4 DISPOSITIVO DI ALLENTAMENTO
FUNE
1.5 VALVOLA DI SICUREZZA CONTRO I
SOVRACCARICHI
1.6 BLOCCO DI EMERGENZA
1.7 DISPOSITIVO ANTIROTAZIONE DEI
BRACCI
1.8 RISCHI
RESIDUI
1.9 PITTOGRAMMI PRESENTI SUL
SOLLEVATORE
2. DESTINAZIONE
D’USO
3. DATI
TECNICI
3.1 MOVIMENTAZIONE
E
PREINSTALLAZIONE
4.
DESCRIZIONE DEL SOLLEVATORE
4.1 CARATTERISTICHE
TECNICHE
PRINCIPALI
4.2 COMANDI DEL SOLLEVATORE
4.3 ATTITUDINE
ALL'IMPIEGO
5.
VERIFICA DEI REQUISITI MINIMI
RICHIESTI PER LUOGO DI
INSTALLAZIONE
6.
ISTRUZIONI PER L'INSTALLAZIONE
6.1 MONTAGGIO DEL SOLLEVATORE
6.2 CONTROLLO
TENSIONE
6.3 ALLACCIAMENTO ALLA RETE
6.4 VERIFICA CORRETTA SEQUENZA
FASI
6.5 COMPLETAMENTO E CONTROLLO
6.6 ARRESTO
BRACCIO
6.7 SALVAPIEDI
6.8 MONTAGGIO
TENDINE
6.9 CONTROLLO LIVELLO OLIO
6.10 SMONTAGGIO
7.
ISTRUZIONI PER L’USO DEL
SOLLEVATORE
7.1 USO IMPROPRIO DEL SOLLEVATORE
7.2 USO DI ACCESSORI
7.3 ADDESTRAMENTO DEL PERSONALE
PREPOSTO
7.4 PRECAUZIONI
D’USO
7.5 IDENTIFICAZIONE DEI COMANDI E
LORO FUNZIONE
7.6 PROCEDURA DI EMERGENZA:
DISCESA IN ASSENZA DI TENSIONE
8. INCONVENIENTI
9. MANUTENZIONE
9.1 GUIDE DI SCORRIMENTO
9.2 CAVI DI RIALLINEO
9.3 CONTROLLO LIVELLO OLIO
9.4 CONTROLLO
MARTELLETTO
10. ACCANTONAMENTO
10.1 ROTTAMAZIONE
11. IMPIANTO
ELETTRICO
11.1 IMPIANTO IDRAULICO
11.2 IMPIANTO PNEUMATICO
12. TAVOLE PEZZI DI RICAMBIO
13. RAPPORTO DI INSTALLAZIONE -
VISITA PERIODICA - MANUTENZIONI
STRAORDINARIE E RIPARAZIONI
14. DATI DI IDENTIFICAZIONE DELLA
MACCHINA
0.
GENERAL SAFETY PRECAUTIONS
1. SAFETY
DEVICES
1.1 PADLOCKABLE MAIN SWITCH
1.2 DEADMAN
DEVICE
1.3 DEVICE TO PREVENT ACCIDENTAL
DESCENT
1.4 HOIST CABLE SLACK DEVICE
1.5 OVERLOAD
VALVE
1.6 EMERGENCY
BLOCK
1.7 ARM ANTI-ROTATION DEVICE
1.8 INDICATION OF OUTSTANDING RISKS
1.9 PICTOGRAMS ON LIFT
2. INTENDED
USE
3. TECHNICAL
DATA
3.1 PRE-INSTALLATION AND MOVEMENT
4.
DESCRIPTION OF LIFT
4.1 MAIN
TECHNICAL
SPECIFICATIONS
4.2 LIFT
CONTROLS
4.3 SUITABILITY FOR USE
5. CHECKING
THE
MINIMUM
REQUIREMENTS FOR THE PLACE OF
INSTALLATION
6. INSTALLATION
INSTRUCTIONS
6.1 ASSEMBLING
THE
LIFT
6.2 VOLTAGE
CHECK
6.3 CONNECTING UP TO THE MAINS
6.4 PHASE SEQUENCE CHECK
6.5 COMPLETION AND CHECK
6.6 ARM
STOP
6.7 FOOT
GUARDS
6.8 ASSEMBLING
CURTAINS
6.9 CHECKING THE OIL LEVEL
6.10 DISMANTLING
7.
INSTRUCTIONS FOR USING THE LIFT
7.1 IMPROPER USE OF THE LIFT
7.2 USE OF ACCESSORIES
7.3 STAFF
TRAINING
7.4 IMPORTANT CHECKS TO BE MADE
7.5 DESCRIPTION AND FUNCTION OF
CONTROLS
7.6 EMERGENCY
PROCEDURE:
EMERGENCY DROP WITH POWER
OFF
8. TROUBLESHOOTING
9. MAINTENANCE
9.1 SLIDEWAYS
9.2 RE-ALIGNMENT
CABLES
9.3 CHECKING OIL LEVEL
9.4 CHECKING THE SAFETY CATCHES
10. STORAGE
10.1 SCRAPPING
11. ELECTRICAL
INSTALLATION
11.1 HYDRAULIC SYSTEM
11.2 PNEUMATIC SYSTEM
12. SPARE
PARTS
TABLES
13. INSTALLATION REPORT -
PERIODICAL VISIT - UNSCHEDULED
MAINTENANCE AND REPAIRING
14. MACHINE IDENTIFICATION DATA
0. ALLGEMEINE
SICHERHEITSVORSCHRIFTEN
1. SICHERHEITSEINRICHTUNGEN
1.1 VERRIEGELBARER
HAUPTSCHALTER
1.2 TOTMANN-SYSTEM
1.3 EINRICHTUNG GEGEN ZUFÄLLIGES
ABSENKEN
1.4 SEILLOCKERUNGSVORRICHTUNG
1.5 ÜBERLASTUNGSSCHUTZVENTIL
1.6 NOT-AUS
1.7 ARMDREHSPERRVORRICHTUNG
1.8 HINWEISE ZU DEN RESTRISIKEN
1.9 AUF DER HEBEBÜHNE VORHANDENE
GEFAHRENZEICHEN
2. BESTIMMUNGSGEMÄSSE
VERWENDUNG
3. TECHNISCHE
DATEN
3.1 TRANSPORT
UND
VORINSTALLATION
4.
BESCHREIBUNG DER HEBEBÜHNE
4.1 TECHNISCHE
HAUPTEIGENSCHAFTEN
4.2 STEUERUNGEN DER HEBEBÜHNE
4.3 BETRIEBSTÜCHTIGKEIT
5. KONTROLLE
DER
MINDESTERFORDERNISSEN FÜR
DEN AUFSTELLUNGSORT
6. INSTALLATIONSANWEISUNGEN
6.1 MONTAGE DER HEBEBÜHNE
6.2 KONTROLLE DER SPANNUNG
6.3 NETZANSCHLUSS
6.4 PRÜFEN DER KORREKTEN
PHASENSEQUENZ
6.5 KOMPLETTIERUNG UND KONTROLLE
6.6 ARMFESTSTELLVORRICHTUNG
6.7 FUSSSCHUTZ
6.8 MONTAGE DER SCHLEUSEN
6.9 ÖLPEGELKONTROLLE
6.10 DEMONTAGE
7.
ANWEISUNGEN FÜR DIE
BEDIENUNG DER HEBEBÜHNE
7.1 UNSACHGEMÄSSE BEDIENUNG DER
HEBEBÜHNE
7.2 GEBRAUCH
VON
ZUBEHÖRTEILEN
7.3 SCHULUNG
DES
BEDIENUNGSPERSONALS
7.4 VORSICHTSMASSNAHMEN
7.5 DIE STEUERUNGEN UND IHRE
FUNKTIONEN
7.6 NOT-AUS-PROZEDUR SENKEN BEI
STROMAUSFALL
8. BETRIEBSSTÖRUNGEN
9. WARTUNG
9.1 GLEITBAHNEN
9.2 FLUCHTUNGSKABEL
9.3 PEGELKONTROLLE
9.4 KONTROLLE
DER
SICHERHEITSKLINKEN
10. EINLAGERUNG
10.1 VERSCHROTTUNG
11. ELEKTROANLAGE
11.1 HYDRAULIKANLAGE
11.2 DRUCKLUFTANLAGE
12. ERSATZTEILELISTEN
13. INSTALLATIONSBERICHT
-
PERIODISCHER KUNDENBESUCH -
AUSSERORDENTLICHE
WARTUNGEN UND REPARATUREN
14. KENNZEICHNUNGSDATEN
DER
MASCHINE
Summary of Contents for KPH 374 Series
Page 12: ...12 0483 M002 1 2 4000 Kg Min 1000 mm P1 P2 P1 P2...
Page 16: ...16 0483 M002 1 3 A...
Page 26: ...26 0483 M002 1 2 6 B 3 A...
Page 28: ...28 0483 M002 1 5 4 B A C D 5 Kgm 6...
Page 30: ...30 0483 M002 1 6 A B C D 7 8 C 6...
Page 34: ...34 0483 M002 1 9 6 10...
Page 36: ...36 0483 M002 1 A 12 11 6...
Page 40: ...40 0483 M002 1 13 14 7 0 B A...
Page 42: ...42 0483 M002 1 NO SI 7...