Instructions for Use RAUMEDIC
MPR2 logO
Manufacturer:
RAUMEDIC AG, Hermann-Staudinger-Strasse 2, 95233 Helmbrechts, Germany
Page 59 of 99
•
Carry out a zero compensation of the pressure channel of the third-party system (MPR2 provides
0 mmHg).
•
Check the sensitivity of the third-party system (MPR2 provides 20 mmHg).
•
Select the pressure channel on the MPR2 and switch to the third-party system.
•
Set the alarm limits of the third-party system to a maximum of 350 mmHg, if monitoring is required.
Establish the cable connection between an analogue output of the MPR2 and a pressure measurement
input of the third-party system. Here it is immaterial whether you use Out-1 or Out-2 on the MPR2. Now
skip to the set-up screen
by pressing the screen selector key several times, if and when required,
and carry out the following steps 1 to 6:
Step 1:
Access the Device setup and
select the analogue output, to
which the cable connection is to be
established, such as Out1.
Step 2:
Establish the cable connection to
the third-party system, and
subsequently press the OK key.
Step 3:
Carry out the zero calibration at
the pressure input of the third-
party system. Press the OK key
when the zero calibration has
been completed successfully.
Step 4:
Check whether the third-party
system renders 20 mmHg
±
2 mmHg, and press the OK key.
Step 5:
The available pressure signals are
displayed (soft keys). Use a key to
select a signal, such as ICP2.
Step 6:
When the signal has been passed
through to the MPR2 successfully,
the overview screen is displayed
on the MPR2, and the third-party
system indicates the pressure
signal passed through.
After successfully signal relaying to the third-party system set the alarm limits.
For each one of the steps 3 to 5 you have 180 seconds to press the next button. In case of a
timeout the system switches to step 1. The connection to the analogue output is not established.
At least 355 mmHg are released at the analogue output of the MPR2.
The zeroing of the downstream monitor should be carried out when the MPR2 is at the right
temperature. If this is not possible, the zeroing of the downstream monitor (screen 4, Out1 / Out2)
has to be repeated at the right temperature in order to compensate the drift. The zero point of
the pressure sensor is not lost by this action.
This
document
is
for
information
only