Initial start-up
8 / 85
During initial start-up of your new device, you will be requested to start an automatic self-
test. This self-test takes about 45 minutes and is used to adapt the device to the specific
environmental conditions. Please note the following:
- For the self-test to be carried out, all the packaging materials must have been removed
from the device; check the grid shelves and the air baffle for a correct fit.
- The device must be connected in accordance with the installation instructions.
- For unit size 6x1/1, 10x1/1, 6x2/1 and 10x2/1 GN, place a flat GN container with the
opening facing downwards in the centre of the grid shelves.
- For unit size 20x1/1 and 20x2/1 GN place two GN-containers in the mobile oven rack.
Place one flat container with the opening facing downwards in the centre in front of both
the upper and lower fan wheel.
Risk of fire!
Remove the packaging material, starter kit as well as grids and containers.
The cooking cabinet door must not be opened during the self-test. Opening the cooking cabinet
door will lead to failure of the self-test. Restart the self-test by switching the device off. Always
allow a hot device to cool down first. If the test is interrupted you will be requested next day by
the device to start the self-test again.
step
info/button
instructions
1
Open the cooking cabinet door and remove
packaging material, starter kit, grids and
containers.
2
Insert an empty GN-tray with the opening
facing downwards into the rack in front of
each fan wheel. Please refer to the installation
instructions for further details.
3
Close the cooking cabinet door to start the self-
test.
Summary of Contents for CombiMaster Plus 61
Page 1: ...Original operating instructions CombiMaster Plus ...
Page 83: ...EU Declaration of Conformity for electrical appliances 83 85 ...
Page 84: ...EU Declaration of Conformity for gas appliances 84 85 ...
Page 85: ... ...
Page 86: ... ...
Page 87: ... ...
Page 88: ...80 05 001 V 05 MDS Ad 02 16 ...