67
Rasilient Confidential
- Use or disclosure of data contained on this page is
subject to the restriction on the title page of this document.
E
S
M
C
A
N
IS
T
E
R
2
F
A
N
4
P
S
U
1
P
S
U
2
Drive 78
Drive 79
Drive 80
Drive 81
Drive 82
Drive 83
Drive 84
Drive 85
Drive 86
Drive 87
Drive 88
Drive 89
Drive 90
Drive 91
Drive 64
Drive 65
Drive 66
Drive 67
Drive 68
Drive 69
Drive 70
Drive 71
Drive 72
Drive 73
Drive 74
Drive 75
Drive 76
Drive 77
Drive 52
Drive 53
Drive 54
Drive 55
Drive 56
Drive 57
Drive 58
Drive 59
Drive 60
Drive 61
Drive 62
Drive 63
Drive 40
Drive 41
Drive 42
Drive 43
Drive 44
Drive 45
Drive 46
Drive 47
Drive 48
Drive 49
Drive 50
Drive 51
Drive 28
Drive 29
Drive 30
Drive 31
Drive 32
Drive 33
Drive 34
Drive 35
Drive 36
Drive 37
Drive 38
Drive 39
Drive 14
Drive 15
Drive 16
Drive 17
Drive 18
Drive 19
Drive 20
Drive 21
Drive 22
Drive 23
Drive 24
Drive 25
Drive 26
Drive 27
Drive 00
Drive 01
Drive 02
Drive 03
Drive 04
Drive 05
Drive 06
Drive 07
Drive 08
Drive 09
Drive 10
Drive 11
Drive 12
Drive 13
SEM 1
SEM 2
F
A
N
3
F
A
N
2
F
A
N
1
E
S
M
C
A
N
IS
T
E
R
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
G
F
E
D
C
B
A
C
H
A
S
S
IS
F
R
O
N
T
C
H
A
S
S
IS
R
E
A
R
Figure 2-58: Indicator on the top of the SEM
Indicator
Description
Power LED (Green)
On – SEM power on
Off – SEM power fault
Alarm LED (Amber)
On – SEM fault
Off – Normal
Table 2-1 Indicator information on the top of the SEM
WARNING
: Pay attention to the label on the top of the SEM, to avoid the risk of personal injury, do not
touch the SEM before power off.
Figure 2-59: SEM label
2.4.6.2
SEM Card Installation and Removal
This section simply introduces the SEM card installation process which will happen on customer side.
NOTE
:2 SEM cards have been installed when users unpack.
Step 1:
Pull out Chassis from Rack. See
Step 2:
Open the chassis cover.