AH-07-01.8
Vector AA90 Applicators - Maintenance
5 6
5 6
5 6
5 6
5 6
Daily (or at start of each shift)
Daily (or at start of each shift)
Daily (or at start of each shift)
Daily (or at start of each shift)
Daily (or at start of each shift)
• Verify that ALL solvent safety containers are
grounded!
• Check within 20-feet of the point of operation
(of the applicator) and remove or ground ALL
loose or ungrounded objects.
• Inspect workholders for accumulated coating
materials (and remove such accumulations).
• Check that atomizer assembly is clean and
undamaged.
• Check the applicator electrode for damage.
• Clean the fluid filter, if necessary.
• Turn the control unit power ON. Its green pilot
should light or Aviator will be audible.
• Run a voltage output test.
Applicator High V
Applicator High V
Applicator High V
Applicator High V
Applicator High Voltage Output
oltage Output
oltage Output
oltage Output
oltage Output
T
T
T
T
Test (Cascade/Classic)
est (Cascade/Classic)
est (Cascade/Classic)
est (Cascade/Classic)
est (Cascade/Classic)
Use high voltage probe assembly (76652-01).
1. Set the meter dial to the kV scale. Plug the high
voltage probe into the side of the meter.
2. Attach the ground clamp to a proven earth
ground.
3. Make sure all grounded objects are at least
2-feet away.
4. Line up the hole in the test probe and the
electrode. Slide the test probe straight over the
electrode wire of the applicator.
>
Injury to personnel and damage to
equipment is probable if the ground clip is
NOT ATTACHED
NOT ATTACHED
NOT ATTACHED
NOT ATTACHED
NOT ATTACHED. This step MUST
MUST
MUST
MUST
MUST be
accomplished before voltage is applied.
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
!!!!!
5. Holding the metal portion of the high voltage
probe in your hand, trigger the applicator so voltage
exists at the electrode.
>
To provide proper equipment to operator
ground, the conductive handle of the probe
MUST
MUST
MUST
MUST
MUST be held in the bare hand of the
operator. To avoid a shock hazard, the
meter should NEVER
NEVER
NEVER
NEVER
NEVER be disconnected from
the probe during high voltage contact.
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
!!!!!
6. Read the voltage displayed on the meter.
7. Turn the voltage to the applicator OFF, and pull
the test probe straight off the electrode.
Shutdown (or at end of shift)
Shutdown (or at end of shift)
Shutdown (or at end of shift)
Shutdown (or at end of shift)
Shutdown (or at end of shift)
1. Turn the control unit/power supply power OFF.
2. Turn the paint supply OFF.
3. Turn the shaping air supply OFF.
4. Wipe the applicator, cable, and hoses with a
rag and a suitable cleaning solvent.
5. Flush the fluid lines and applicator. Then bleed
the fluid pressure to zero, and allow the solvent to
remain in the lines (see “Flushing Procedures” in
this section).
6. Set the trigger stop lever.
Summary of Contents for Vector AA90 79580
Page 19: ...AH 07 01 8 Vector AA90 Applicators Introduction 14 14 14 14 14 NOTES NOTES NOTES NOTES NOTES...
Page 43: ...AH 07 01 8 Vector AA90 Applicators Installation 38 38 38 38 38 NOTES NOTES NOTES NOTES NOTES...
Page 73: ...AH 07 01 8 Vector AA90 Applicators Maintenance 68 68 68 68 68 NOTES NOTES NOTES NOTES NOTES...