5.REMOVAL OF THE DD MOTOR AND START/STOP PCB DIP ASSEMBLY AND
TOGGLE
SWITCH PCB DIP ASSEMBLY AND
RIGHT PCB ASSEMBLY(SMT/DIP) AND LEFT PCB
ASSEMBLY(DIP) AND RIHGT FRONT PCB DIP ASSEMBLY AND FSR PCB
ASSEMBLY(SMT). (Fig.5)
(A) REMOVE THE 8 PCS SCREWS AND 6 PCS WASHER AND 2 PCS
WASHER EXTERNAL BEFORE
REMOVAL OF
DD MOTOR.
(B) REMOVE THE 12 PCS SCREWS AND 4 PCS CONNECTOR BEFORE REMOVAL OF START/STOP PCB
DIP AND
TOGGLE SWITCH PCB DIP ASSEMBLY.
(C) REMOVE THE 60 PCS SCREWS AND 4 PCS CONNECTOR AND 8 PCS COPPER BEFORE REMOVAL OF
RIGHT PCB ASSEMBLY(SMT/DIP) AND
LEFT PCB ASSEMBLY(DIP) AND
RIHGT FRONT PCB DIP
ASSEMBLY.
(D) REMOVE THE 2 PC CONNECTOR BEFORE REMOVAL OF FSR PCB ASSEMBLY(SMT).
Fig.5
Summary of Contents for NK49
Page 10: ......
Page 11: ......
Page 12: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......