36 1/2"
48"
73"
38"
65 1/2"
77"
0069
0073
9133
9133
0067
6092
6090
H1
H108
H1
H108
H1
H108
H108
H1
252
248
235
235
228
226
246
A
B
1"
1 1/4"
INSET A
2"
INSET B
*NOTE: Pre-drill holes for all 5/16" Lag Bolts with a 1/8" Drill Bit.
1. Position Corner Posts
(226)
(6090)
and Lower Corner Post
(228) (6092)
on the ground with
counter-sunk holes in Corner Posts
(226)
(6090)
facing in towards each other. (Diagram shows
assemblies standing up for proper assembly only.)
2. Make sure Corner Posts
(226)
(6090) (228) (6092)
are
38"
and
73"
apart, then attach 6 Hole Facia
(246)
(0067)
to Corner Posts using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Facia must be
flush with the bottom and outsides of Corner Posts, and offset holes must be up (as shown in Inset A).
3. Measure up
65 1/2"
and
77"
on Corner Posts and attach Arched Facia
(248)
(0069)
and Arched
Facia with Hole
(252)
(0073)
using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Make sure
measurements between Corner Posts are correct and assembly is square.
4. Measure up
36 1/2"
and
48"
on Corner Posts
(226)
(6090) (228) (6092)
and attach 2 Hole Facias
(235)
(9133)
to Corner Posts using 5/16" Hardware
(H108)
and 1/4" Hardware
(H1)
. Holes in Facias
should be down (as shown in Inset B).
20
Step 2
Wall Assembly