3"
2 5/8"
2 5/8"
1169
1217
9132
0074
9133
6093
0075
9140
1217
1169
9140
0069
0066
0073
23
23
234
248
213
253
242
213
242
23
252
23
242
254
245
229
235
H194
H194
9140
1169
1169
H194
1. Evenly space Rail Uprights
(23)
(1169)
between Corner Posts
(226)
(6090) (227) (6091) (228) (6092)
and attach to Top Joist w/Swing Holes
(229) (6093)
, 6 Hole Facia
(253)
(0074)
,
and 2 Hole Facias
(234)
(9132) (235) (9133)
using #8 Hardware
(H194)
. Use the measurements in the diagram below
for approximate spacing between Rail Uprights
(23) (1169)
.
2. Flush one face of Rail Uprights
(23)
(1169)
with ends of Corner Facias
(242)
(9140)
and attach to
Corner Facias
(242) (9140)
and Arched Facias
(245) (0066) (252) (0073)
using #8 Hardware
(H194)
.
3. Position one face of Rail Uprights w/Handle Holes
(213)
(1217)
flush with ends of Corner Facias
(242)
(9140)
and attach to Corner Facias
(242)
(9140)
and Arched Facia
(248)
(0069)
using #8
Hardware
(H194)
.
28
Step 10
Rail Installation