11. Put 2-by-4 spacers between the template and the top of the form. The bottom of the bolt
threads should be about 1 cm (0.5 in) above the concrete (
(p. 14)). The template
must be level in two dimensions.
FIGURE 6-2. Cut-away view shows anchor bolt and conduit placement in cement pad
12. Use a trowel and edger to finish.
13. Wait 24 hours before removing the concrete form.
14. Wait seven days before mounting the pole.
6.2 Pole installation
The following components included with the WS-PRO2 are used for this installation procedure:
(1) top pole section (tapered)
(1) base pole section
(6) 5/8-inch washers
(1) 4 m (12 ft), 10 AWG green copper stranded wire
Section 6. Installation
14