Adjust  Water  Budget  Percent

The  Water  Budget  feature  on  the  ESP-TM  lets  you 

increase  or  decrease  the  run  times  of  all  stations  by  a 

selected  percentage.  You  may  adjust  the  run  times  as  low 

as  10  percent  and  as  high  as  200  percent.  Adjustments 

must  be  made  in  increments  of  10  percentage  points.

The  percentages  are  calculated  on  the  normal 

programmed  run  times  for  each  station.  For  example,  if  a 

station  is  programmed  to  run  for  10  minutes,  and  you  set 

the  water  budget  percent  to  80%,  the  station  will  run  for  8 

minutes  (80%  of  10  minutes).  If  you  set  the  water  budget 

to  120%,  that  same  station  will  run  for  12  minutes  (120% 

of  10  minutes).

The  water  budget  feature  can  be  useful  for  cutting  back 

watering  during  cool  winter  months,  or  for  increasing 

watering  during  periods  of  unusual  heat.  Keep  in  mind 

that  the  percentage  you  set  applies  to

  ALL

  stations  on

BOTH 

programs.

                                                                                                                                                                           

ESP-TM  Installation  and  Operation                                                                                                                                                                                           

Page  21

3

2

1

Turn  the  dial  to  ADJUST  WATER  %.

The  display  shows  the  current  water  budget  setting

(between  10%  and  200%).  A  setting  of  100%  means

that  all  stations  will  run  according  to  their  normal

programmed  run  times.

Press              or              to  increase  or  decrease  the

percentage  in  10-point  increments.

When  water  budgeting  is  set  above  or  below  100

percent,  the  words  WATER  BUDGET  will  appear  in

the  top  of  the  display.

To  turn  off  water  budgeting,  repeat  steps  1  to  3,  and

set  the  percentage  to  100%.

ESP-TM  Installation  and  Operation               

Page  22

All manuals and user guides at all-guides.com

Summary of Contents for ESP-TM Series

Page 1: ...out Controls and Switches Turn Controller On and Off Adjust Water Budget Percent Use Manual Start Advance Run Test Program INSTALLING THE CONTROLLER Select Location Mount Controller Connect Field Wiri...

Page 2: ...ring a hot or cool period Start the sprinkler system manually Install a new battery Replace the fuse Troubleshoot a controller problem page 11 page 19 page 21 page 23 page 25 page 25 page 36 The contr...

Page 3: ...uttons used to set times and days and to make program changes A B Program Button used to select watering program A or B On some ESP models this button is labeled PGM Manual Start Advance Button used t...

Page 4: ...r system turns on and how long the sprinklers run Programming is the process of telling the controller exactly when and how long you want to water The controller opens and closes the remote control va...

Page 5: ...Program A You may have up to three separate start times for each program Enter the run time for each station assigned to Program A Enter 0 for stations that are not used in Program A Repeat steps 2 4...

Page 6: ...Program A Program B P N 632989A am pm am pm am pm am pm am pm am pm Select Watering Schedule To use a fixed schedule move the Schedule Slide Switch to one of the FIXED positions 2 every other day 3 ev...

Page 7: ...urrently set Press or to set the current minute 1 2 3 4 5 6 ESP TM Installation and Operation Page 11 Set Current Day Setting the current day varies somewhat depending on whether you are using a custo...

Page 8: ...Operation Page 13 Select Program The program that is currently selected appears in the far left corner of the display The display will show either PGM A or PGM B To select the program press the A B o...

Page 9: ...utton to set the selected day of the week on or off Turn the dial to the next day of the week Repeat steps 2 and 3 until you have set each day of the week either on or off ESP TM Installation and Oper...

Page 10: ...ird watering start times For example if you are growing new lawn seed you might want to water several times a day To do so you could set a program to run at 6 00 AM 11 00 AM and 4 00 PM 1 2 3 ESP TM I...

Page 11: ...hen the entire program is complete the display will change back to the current day and time If you forget to turn the dial to AUTO the controller will eventually set itself to automatic operation The...

Page 12: ...t the water budget to 120 that same station will run for 12 minutes 120 of 10 minutes The water budget feature can be useful for cutting back watering during cool winter months or for increasing water...

Page 13: ...TM Installation and Operation Page 23 Run Test Program The ESP TM controller has a built in test program that will run each station in sequence for two minutes You can use this program to check out t...

Page 14: ...s of programming data Rain Bird recommends that you replace the lithium coin cell battery once a year In addition if a short circuit occurs in the sprinkler system you may have to replace the fuse 1 2...

Page 15: ...pplied mounting template in the desired location on the wall Mark the screw center locations by punching through the template with a sharp tool Remove the template Two plastic spacers are provided for...

Page 16: ...res smaller than 18 gauge should be doubled over before being inserted into the flip strip To connect field wires raise the flip strip lever to the open position Insert the stripped wire into the roun...

Page 17: ...nal and COM terminal as shown in the illustration ESP TM Installation and Operation Page 31 Pump Start Relay Wiring NOTE Complete this section ONLY if your system requires a pump start relay The MV te...

Page 18: ...wer is completely closed then reinstall the lower face panel See page 25 for complete instructions Install Battery ESP TM Installation and Operation Page 33 Install Transformer 1 2 CAUTION DO NOT plug...

Page 19: ...g Use the MAN START ADV button to run a watering program Press MAN START ADV to cycle through each station If the fuse blows again on a particular station that station s solenoid or field wires may ha...

Page 20: ...t moving or advancing Same as Cause 3 See correction for Cause 3 SYMPTOM CAUSE CORRECTION Remove the lower face plate cover by gently prying it out along the slots on the outside right and left edges...