RADWIN 5000 SCB Jet User Manual
Release 4.2
4-4
Preparations Before You Start
Hardware Installation
Ethernet cable Repeater
The RADWIN Ethernet repeater enables you to extend the PoE-to-ODU cable beyond the
100m limit (but no more than 200m):
Figure 4-5: RADWIN Ethernet Repeater
4.4 Preparations Before You Start
Before you actually start the installation steps, carry out these preparations:
•
Site survey
(
page 4-4
)
•
Site preparation
(
page 4-4
)
•
Prepare
Tools and materials
(
page 4-4
)
4.4.1 Site survey
The Site Survey has three main steps:
Stage 1: Preliminary Survey
Stage 2: Physical Survey
Stage 3: RF Survey
4.4.2 Site preparation
Do the following:
•
Obtain any necessary legal and statutory permits for installation of radio equipment
•
Clear physical obstructions as far as possible
•
Erect a mast or tower if required.
•
Install a pole on a building wall if required
•
Ensure availability of power
•
Ensure that there is a LAN cable in place from the user’s switch to the PoE location
4.4.3 Tools and materials
The following is a list of the equipment and materials required to install RADWIN 5000 SCB
Jet hardware.
•
Crimping tool for RJ-45 (if the ODU-PoE cable is without connectors)
•
Spanner/wrench 13 mm (½”)
•
Drill (for wall mounting only)