Radleys GreenHouse Instructions Manual Download Page 13

GreenHouse Blowdown Parallel Evaporation System

Set-Up - Using Vial Racks or Micro Titer Plates

Using the GreenHouse Blowdown Evaporator as a Stand Alone Unit

As a stand alone unit, the GreenHouse Blowdown Evaporator is used only for

Blowdown and not for synthesis.  The Stand Alone Base is used instead of the 

standard GreenHouse Base (the Blowdown Base Adaptor is not required). 

As a Stand Alone unit the GreenHouse Blowdown Evaporator is used to

evaporate solvents from vials or micro titer plates only.

Vial racks are shown above and listed under Accessories on page 4. These racks

simply locate in the Blowdown Stand Alone Base and require no special fitting.

When using vials rack always select the correct Blowdown Pin Plate. 

RR99673 - Blowdown Pin Plate for 24 position racks or MTPs. 

RR99674 - Blowdown Pin Plate for 8 position racks or MTPs. 

Important Note

The Stand Alone Unit is not designed for the Blowdown evaporation

of GreenHouse reaction tubes.  This can only be undertaken using

the standard GreenHouse Base and GreenHouse reaction block.

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important, 

AT01

AT05

AT06

AT03

AT02

Base Adapter with 

8 position vial rack

Base Adapter with 

24 position vial rack

Base Adapter with 

24 position MTP

Stand Alone Base with 

8 position vial rack

Stand Alone Base with 

24 position vial rack

Stand Alone Base with 

24 position MTP

Page 12

Using the Standard GreenHouse Base with the Blowdown Base Adaptor 

The Blowdown Base Adaptor allows use of vial racks or standard micro titer 

plates. Choose from 5 standard vial racks in 24 or 8 position formats. 

Vial racks are shown right and listed under Accessories on page 4. These racks 

simply locate in the Blowdown Base Adaptor and require no special fitting.

When using vials rack always select the correct Blowdown Pin Plate. 

RR99673 - Blowdown Pin Plate for 24 position racks or MTPs. 

RR99674 - Blowdown Pin Plate for 8 position racks or MTPs. 

Having fitted the Blowdown Pin Plate (see page 7), Blowdown 

Base Adaptor and appropriate vial rack or micro titer plate now 

return to page 8 and follow instructions.

Having fitted the Blowdown Pin Plate (see page 7) and appropriate vial rack

or micro titer plate now return to page 8 and follow instructions.

Summary of Contents for GreenHouse

Page 1: ...down Parallel Evaporation System Your Local Distributor February 2023 Issue 5 Radleys Shire Hill Saffron Walden Essex CB11 3AZ United Kingdom Tel 44 0 1799 513320 Fax 44 0 1799 513283 Email sales radl...

Page 2: ...6 Set up Operation Page 7 Set up Operation continued Page 8 Set up Operation continued Page 9 Set up Operation continued Page 10 Temperature Control Page 11 Example Evaporation Times Examples of Blow...

Page 3: ...rays GreenHouse Blowdown Evaporator System is ideal for the evaporation of HPLC fractions in vials or micro titer plates Digitally controlled heating from a standard Carousel or IKA stirring hotplate...

Page 4: ...ing blowdown ALWAYS ENSURE that inert gas flow rate is within recommended limits Page 3 Warning Applies when there is a possibility of personal injury Important Note Alerts the user to important facts...

Page 5: ...9684 Blowdown Condenser RR99688 Blowdown 150ml Reservoir RR99658 System 17 GreenHouse Blowdown Complete Upgrade Comprising of the following RR99670 GreenHouse Blowdown Head RR99672 Long Blowdown Pin P...

Page 6: ...wdown Condenser RR99688 Blowdown 150ml Reservoir RR99691 AT01 Vial Rack 4 x 2 For 27 8mm OD Vials RR99692 AT02 Vial Rack 6 x 4 For 13mm OD Vials RR99693 AT03 Vial Rack 6 x 4 For 13 8mm OD Vials RR9969...

Page 7: ...ing giving them superior chemical resistance to most solvents and acids when compared with unplated aluminium or stainless steel They also contain Hastelloy springs and use a Kalrez fluoropolymer seal...

Page 8: ...can damage the threads Important Important Important Important Important Important Important Important Important Important Important Important Important Important Important Note Allow the Reaction Blo...

Page 9: ...tightening may damage the thread Do not use a spanner or wrench to tighten sealing knobs Important Important Important Important Important Important Important Important Important Important Important...

Page 10: ...reduced for thermally less stable compounds See page 13 for important information on pressure control Important Note If the tubes are more than half full use a slower flow rate increasing the flow rat...

Page 11: ...re to the desired level by following the instructions of RR98073 Fuzzy Logic Digital Temperature Controller The set temperature can be maintained to 0 5 C The maximum recommended operating temperature...

Page 12: ...ad Standard GreenHouse Base and GreenHouse Reaction Block GreenHouse with Blowdown Head Standard GreenHouse Base Base Adapter and 24 Position Vial Rack GreenHouse with Blowdown Head Standard GreenHous...

Page 13: ...Important Important Important Important Important Important Important Important Important Important Important Important Important AT01 AT05 AT06 AT03 AT02 Base Adapter with 8 position vial rack Base...

Page 14: ...portant Warning The Blowdown Head Safety Pressure Relief Valve and Gas Inlet Safety Pressure Relief Valve are designed to vent at nominally 4 to 6psi Therefore under normal and correct operation proce...

Page 15: ...with Silicone Rubber It is also more resistant to aromatic hydrocarbons Viton exhibits relatively good resistance to trifluoroacetic acid TFA and is the preferred gasket in this case Thermal Resistan...

Page 16: ......

Reviews: