Connect gas outlet from GreenHouse Blowdown Evaporator to the inlet at the top

of the condenser. Ensure condenser is properly secured and clamped. Screw the

solvent collection flask to the bottom of the condenser.

Fill reservoir of condenser with dry ice and cautiously add acetone in small

portions until most of the dry ice is covered.

Set-Up & Operation

- continued

GreenHouse Blowdown Parallel Evaporation System

Page 9

If the reaction tubes are less than half full, slowly and carefully open the

Flowmeter valve until the flow rate is 10 to 15 litres per minute. 

If the flow rate is correct, it should just ‘dimple’ the solvent surface.

7

8

Important Note

Ensure that the cooling reservoir is kept topped up with dry ice 

during extended evaporations!

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important, 

Switch on the heating control on the stirring hotplate and set the Fuzzy Logic

Temperature controller to an appropriate value. Normally 40˚C is enough

and this should not normally cause decomposition of product. However

this temperature may be increased for high boiling solvents such as DMF

or reduced for thermally less stable compounds. 

See page 13 for important information on pressure control.

Important Note

If the tubes are more than half full use a slower flow rate

- increasing the flow rate as the solvent evaporates.

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important, 

Important Note

Excessive flow rates may cause solvent to be ejected from the tubes

with loss of material and possible cross-contamination. Do not

immerse the blowdown pins below the surface of the solvent.

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important, 

9

Warning

Dry ice causes burns!

Ensure that suitable protective clothing 

(eye protection, insulated gloves and apron) is used during filling 

or emptying. 

!

Warning

The Blowdown Head Safety Pressure Relief Valve and Gas Inlet Safety Pressure Relief Valve are designed to

vent at nominally 4 to 6psi. Therefore under normal and correct operation procedures neither valve should be

venting.

!

Important Note

Do not use air for evaporation in the GreenHouse Blowdown due to

the possibility of oxidation of the product during evaporation.

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important,

Important, Important, 

Summary of Contents for GreenHouse

Page 1: ...down Parallel Evaporation System Your Local Distributor February 2023 Issue 5 Radleys Shire Hill Saffron Walden Essex CB11 3AZ United Kingdom Tel 44 0 1799 513320 Fax 44 0 1799 513283 Email sales radl...

Page 2: ...6 Set up Operation Page 7 Set up Operation continued Page 8 Set up Operation continued Page 9 Set up Operation continued Page 10 Temperature Control Page 11 Example Evaporation Times Examples of Blow...

Page 3: ...rays GreenHouse Blowdown Evaporator System is ideal for the evaporation of HPLC fractions in vials or micro titer plates Digitally controlled heating from a standard Carousel or IKA stirring hotplate...

Page 4: ...ing blowdown ALWAYS ENSURE that inert gas flow rate is within recommended limits Page 3 Warning Applies when there is a possibility of personal injury Important Note Alerts the user to important facts...

Page 5: ...9684 Blowdown Condenser RR99688 Blowdown 150ml Reservoir RR99658 System 17 GreenHouse Blowdown Complete Upgrade Comprising of the following RR99670 GreenHouse Blowdown Head RR99672 Long Blowdown Pin P...

Page 6: ...wdown Condenser RR99688 Blowdown 150ml Reservoir RR99691 AT01 Vial Rack 4 x 2 For 27 8mm OD Vials RR99692 AT02 Vial Rack 6 x 4 For 13mm OD Vials RR99693 AT03 Vial Rack 6 x 4 For 13 8mm OD Vials RR9969...

Page 7: ...ing giving them superior chemical resistance to most solvents and acids when compared with unplated aluminium or stainless steel They also contain Hastelloy springs and use a Kalrez fluoropolymer seal...

Page 8: ...can damage the threads Important Important Important Important Important Important Important Important Important Important Important Important Important Important Important Note Allow the Reaction Blo...

Page 9: ...tightening may damage the thread Do not use a spanner or wrench to tighten sealing knobs Important Important Important Important Important Important Important Important Important Important Important...

Page 10: ...reduced for thermally less stable compounds See page 13 for important information on pressure control Important Note If the tubes are more than half full use a slower flow rate increasing the flow rat...

Page 11: ...re to the desired level by following the instructions of RR98073 Fuzzy Logic Digital Temperature Controller The set temperature can be maintained to 0 5 C The maximum recommended operating temperature...

Page 12: ...ad Standard GreenHouse Base and GreenHouse Reaction Block GreenHouse with Blowdown Head Standard GreenHouse Base Base Adapter and 24 Position Vial Rack GreenHouse with Blowdown Head Standard GreenHous...

Page 13: ...Important Important Important Important Important Important Important Important Important Important Important Important Important AT01 AT05 AT06 AT03 AT02 Base Adapter with 8 position vial rack Base...

Page 14: ...portant Warning The Blowdown Head Safety Pressure Relief Valve and Gas Inlet Safety Pressure Relief Valve are designed to vent at nominally 4 to 6psi Therefore under normal and correct operation proce...

Page 15: ...with Silicone Rubber It is also more resistant to aromatic hydrocarbons Viton exhibits relatively good resistance to trifluoroacetic acid TFA and is the preferred gasket in this case Thermal Resistan...

Page 16: ......

Reviews: