D9000/D7000 Series Operation & Installation Manual
Page 22
74-07692-000-C 4/97
The panel stops monitoring the phone line during
its phone line trouble response. If the response
includes sending a report, the panel does not
resume monitoring until the report is
acknowledged or it goes into communication
failure.
Bad line may test OK: The telephone line
monitor uses voltage and current levels to test the
status of the phone line. In some instances a
given telephone line may be out of service
without affecting the voltage on the line. The
phone line monitor can not recognize this trouble
condition.
Phone Line Test Points
You can attach a telephone test set to the panel
at the TELTEST points located above the TELCO
jack on the lower left corner of the panel. See
Figure 8.
Communication Failure
After 10 attempts to reach the receiver, the panel
goes into communication failure. The panel
clears any reports in the specified Route Group.
COMM FAIL ROUTE # appears in the display at
command centers.
If you use the D928 Dual Phone Line Switcher,
the system makes a total of 10 attempts before
going into communication failure.
Ground Start
Some telephone systems require a momentary
ground input to initiate dial tone. To interface with
a ground start system, insert a plug-in relay
(D136) into socket K6/J5 and set the Phone
Monitor Select jumper to the GND START
position. Terminal 10 must be connected to an
earth ground reference.
Relay Installation
Power down the system before inserting the
D136 relay into socket K6/J5. The relay socket is
in the lower left corner as shown in Figure 6. The
plug-in relay is shorter than the socket it plugs
into. You can install it in either the left or right end
of the socket.
Don’t rely on relay labeling: You shouldn’t rely
on the labelling to install D136 relays. Check for
the side with three pins. The three pins go on the
top side.
Incorrect insertion does not damage the relay or
the panel, however the related circuits do not
function properly. A ground start relay must not
be inserted if the ground start jumper is in the
loop start position (see below).
Phone Monitor Select Jumper
The Phone Monitor Select jumper is above the
TELCO connector and TELTEST point at the
lower left corner of the panel. Set it in the ground
start position. See Figure 9.
Figure 8: Telephone Connections
5
9
10
1
2
Low Battery
LEDs Off When Normal
EARTH GROUND
COMMON
C L ASS 2 T R AN SF O RM E R
1 6 .5 VA C 40 VA 6 0 HZ
P ar t No . D1 6 4 0
I n te rn a lly F u se d - D o N ot Sh o rt
R e q uir e s Un s wit ch ed Ou t le t
D o N ot Sh a r e W ith O th e r Eq u ip m en t
+ A UX P OWE R
BATTERY N EGATIVE ONLY
Maximum Charging
Current 1.4 Amps.
PHONE MONITOR SELECT
Loop Start
Groun d Start
TELCO
CORD
PHON E
LED
ON WHEN
COMM UNI CATING
OF F WHEN IDL E
Requi res
Rel ay
#D136
ON-BOARD POINTS
1.0K
Resistor
Req uired a t End of Line
Ω
VOLTAGE RAN GES
Open 3.7 - 5.0VDC
Normal 2.0 - 3.0VDC
Short 0.0 - 1.3VDC
PERIPHERAL DEVICE WIRING
ZONEX OUT 1
ZONEX IN 1
ZONEX OUT 2
ZONEX IN 2
ZONEX POWER +
ZONEX COMMON
Op er atio n Mo nito r
Pu lses Wh en No rmal
Flic kers Wh en Ri ngi n g
PROG
CONN
RED
YELLOW
GREEN
BL ACK
1 7-0 582 3-0 02
32
POWER +
D ATA BUS A
COMMON
RED
GROUND
START
YEL
RED
R e set Pin
D isa bl e Al l Exce pt Batte ry
Ch arg in g An d Pro gra mmi ng
GRN
STEADY OR
PULSE
+
Charging Status
N.F.P.A.
Style 3.5
Signal ing
Line
Circuits
12
15
1 8
2 1
1 3
11
1 4
16
1 7
1 9
2 0
22
PROGRAMMABLE
ALARM OUTPUTS
Terminals
&
Require
Optional
D136 Relay
in J1 & J9
7
Po int 1
Point 2
Point 3
Poin t 4
Point 5
Point 6
Point 7
Point 8
DATA BUS B
29
31
30
24
23
28
27
26
25
BATTERY POSITIVE ONLY
+ ALTERNATE
SWITCHED
AUX POWER
+
6
7
8
8
3
4
Battery
GRN
O P E R AT O R
M O N IT O R L E D
( G R E E N )
M
P H O N E L IN E
T E S T P O IN TS
P H O N E L E D
(R E D )
P H O N E M O N IT O R
S E L E C T J U M P E R
T E L C O C O R D
C O N N E C TO R (J 3 )
G R O U N D S TA R T
R E L AY (K 6 )
8
9
10
RED
C OM M ON
Gr ou n d Start
Lo op Star t
TE L C O
C O R D
M
P HONE MONITOR S ELECT
+ S WIT C H E D
AU X P O WE R
E A R TH G R OU N D
GROUND
START
R equ ir es
R ela y
#D 13 6
in J5
LO O P S TA RT
P OS ITIO N
GR O U N D S TART
PO S IT ION
Figure 9: Phone Monitor Select
Warning: Ground start not for use in NFPA
applications. You can not use ground start
telephone systems for NFPA Central Station
Protective Signaling or Remote Station
applications.
D928 Dual Phone Line Switcher
Description
The optional D928 Dual Phone Line Switcher
allows the panel to transmit reports over a
secondary phone line when the primary phone
line is faulted. The panel monitors both lines. If a
signal is generated and the panel senses that the
primary phone line is bad, then it will attempt to
use the secondary phone line to send the
message. If trouble is detected, the panel keeps
the faulty phone line in memory.
www.PDF-Zoo.com
firealarmresources.com