Version:
03
Date:
March 16, 2011
Document: Sigma 600 Ver 04
Page 15 of 34
Date 1
e
release: January 1, 2003
Installation instructions
1
Fitting operating instrument
The operating unit should be placed such that the helmsman may readily operate
it. The Sigma 600 should be connected to junction box RZ 903, to another
Sigma 600 or to a Sigma 550. A maximum of three operating units may be
placed in one communication line.
Sufficient space must be left to lay the cables.
A construction drawing will be found at the back of this manual.
Summary of Contents for Sigma 600
Page 1: ......