Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
64
3. Assembly
3.1 General warnings
The boiler must be
positioned
properly for proper operation!
Maximum working pressure of the boiler is 3 bars, minimum working pressure is 1 bar,
while the maximum working temperature of the boiler is 110 ̊C.
The boiler has a fan, automation system, electric heating element and all these devices use
230V power. Therefore, inadequate installation and careless handling may jeopardize human life
through electric shock.
Solid fuel boiler and forced draft should be installed as per the norms and legal regulations
in effect. Any change on either the mechanical contruction or electric installations will be deemed a
violation of terms of the warranty and will lead to its breach.
During the assembly on hydraulic installation, the boiler must be secured in the prescribed
manner from exceeding the maximum working temperature and pressure.
Central heating installer who connects the boiler to the hydraulic system is responsible for
the adequate assembly.
Radiajator Inženjering, as the manufacturer of the boiler, shall have no liability for
damages caused by inadequate boiler installation.
When doing any interventions on the electrical devices of the Ecoflame boiler, the entire
system should be disconnected from the main power supply.