background image

9.13 GEARBOX INSPECTION PROCEDURE 

9.14 REMOVAL AND DISASSEMBLY  

 

 

 
 

 
 
 
 
 

 

 
 

 
 

 

 

 
 

 

 
 

Summary of Contents for SR8

Page 1: ......

Page 2: ......

Page 3: ...CONTENTS...

Page 4: ......

Page 5: ...INTRODUCTION...

Page 6: ...1 INTRODUCTION TO YOUR CAR 1 1 COCKPIT LAYOUT 1 2 DASHBOARD LAYOUT 1 3 ALARMS...

Page 7: ...1 4 DASH CONFIGURATION 1 5 ENGINE BAY LAYOUT...

Page 8: ...1 6 FRONT SUSPENSION LAYOUT 1 7 REAR SUSPENSION LAYOUT...

Page 9: ...1 8 ELECTRICAL HARDWARE LOCATION o o o...

Page 10: ...2 RUNNING YOUR CAR o o o o o o 2 1 PRE SESSION CHECKS o o o o o o...

Page 11: ...2 2 DRIVER CONTROLS o o o o...

Page 12: ......

Page 13: ...3 NEW CAR SHAKEDOWN 3 1 SHAKEDOWN GUIDE o o o o o o o o...

Page 14: ...o o o o o...

Page 15: ...3 2 BEDDING IN THE BRAKES o o o o o o...

Page 16: ...4 TYRE MANAGEMENT o o o o o o o o o...

Page 17: ...5 WORKSHOP INFORMATION 5 1 LIFTING YOUR CAR...

Page 18: ......

Page 19: ...6 CAR SETUP 6 1 HOW TO SET UP THE CAR 6 2 CORNER WEIGHTS...

Page 20: ...ey are returned to cold pressures after setup is complete Rake mm 153 160 222 228 LHD RHD 3 235 REAR n a SR3 Gearing 24 24 220mm 70mm 220m m 70m m 30 to 32 X long Medium Std Long Triple Intrax 95Nm 10...

Page 21: ...6 4 HANKOOK SETUP SHEET...

Page 22: ...6 5 DROP HEIGHTS IN DEPTH...

Page 23: ...6 6 HANKOOK DROP HEIGHTS...

Page 24: ...6 7 DAMPERS...

Page 25: ...6 8 WET WEATHER SET UP...

Page 26: ...7 CAR SERVICING 7 1 FILTER SERVICING 7 2 GEARSHIFT ACTUATOR SETUP...

Page 27: ...7 3 WHEEL SPEED SENSOR SETUP 7 4 BALANCING THE THROTTLE BODIES...

Page 28: ...7 5 GEARBOX INSPECTION 7 6 SELECTOR COVER FITMENT...

Page 29: ...8 TROUBLESHOOTING 8 1 NON STARTING...

Page 30: ...8 2 CHARGING ISSUES...

Page 31: ...8 3 GEARSHIFT ISSUES 8 4 RELAYS...

Page 32: ...9 TORQUE FIGURES AND DIAGRAMS 9 1 ENGINE AND GEARBOX...

Page 33: ...9 2 SUSPENSION COMPONENTS...

Page 34: ...9 3 BRAKING SYSTEM...

Page 35: ...9 10 TORQUE GUIDE...

Page 36: ......

Page 37: ...9 4 ENGINE CONTROL PARAMETERS 9 5 COMMON PARTS...

Page 38: ...9 6 FLUIDS...

Page 39: ...9 8 GEAR RATIOS...

Page 40: ...9 9 STANDARD LONG GEAR RATIO CHART...

Page 41: ...9 10 EXPLODED DIAGRAM GEARBOX...

Page 42: ...9 11 COMPONENT LIFING 9 12 SERVICE SCHEDULE...

Page 43: ...9 13 GEARBOX INSPECTION PROCEDURE 9 14 REMOVAL AND DISASSEMBLY...

Page 44: ......

Page 45: ...9 15 ASSEMBLY AND REFITTING...

Page 46: ......

Page 47: ...are returned to cold pressures after setup is complete Rake mm 153 160 222 228 LHD RHD 3 235 REAR n a SR3 Gearing 24 24 220mm 70mm 220m m 70m m 30 to 32 X long Medium Std Long Triple Intrax 95Nm 100m...

Page 48: ...9 17 HANKOOK SETUP SHEET...

Page 49: ...10 VERSION HISTORY...

Page 50: ......

Reviews: