13 

  

 
INSTRUMENT PANEL          

 

Legend: 

 

1. 

ON/OFF SWITCH  

2. 

D.H. WATER TEMPERATURE 
SETTING KNOB  (40 - 60 °C) 

3. 

POWER INDICATOR        

4. 

D.H.WATER OPERATION 
INDICATOR  

5. 

RESET BUTTON

  

                                                                    

 

PRELIMINARY OPERATIONS  

 

 

Make sure that the gas cock and all  water taps are closed.  

 

Open the cock for the gas counter or for the liquid gas tank meter.  

 

Open the gas cock (not supplied as standard)  located immediately upstream of the heater on the gas intake pipe.  

 

Make sure that the electrical power to the device is on, and check line, neutral adn earth.  

 

Set switch 1 to 

ON: 

power indicator no. 

3

 will light up. (see fig. 1) 

 

Open the hot water tap: the d. h. water operation indicator no.

will light up and the exhaust fan will turn on. The electronic 

ignition board will turn on the main burner. When the water demand stops, the burner will turn off and the water heater will 
wait for the next water demand.  

 

If flame does not ignite, after 10 seconds the gas flow is interrupted and the water heater shuts down.  The indicator no.

5

 

will light up.  

 

Shut down requires manual resetting: to restore operation, wait ten seconds and then push reset button 

5

. Re-ignition is 

provided if the main burner accidentally shuts down. The heater will shut down if the burner does not resume operation 
after ten seconds.  

 

The solenoids will cut gas flow in the vent of electrical failure. When electrical power is restored, repeat the ignition 
sequence.  

 

If flame detection electrode (ionisation) does not work properly, gas flow will be cut and the unit will shut down. (Positive 
safety). 

 

These devices are built to operate with normal water pressure (not exceeding 6 bar), and are equipped with a water 
temperature adjustment knob (40°- 60°C) see fig. 1 no. 

2

 

MINIMUM 

water temperature (40°C) is obtained by turning temperature knob 2 all the way to the left. 

 

MAXIMUM 

water temperature (60°C) is obtained by turning temperature knob all the way to the right.  

 

Whatever the position of the temperature knob, the burner modulates according to flow rate (modulation of flow rate) To 
put the device out of service, cut electrical power, set switch 1 to OFF and close the gas cock. 

 

WARNING 

Please ensure that the boiler in commissioned in line with all BENCHMARK BOOKLET REQUIREMENTS. Failure to do this 
may in validate the guarentee. 

Fig. 1 

Summary of Contents for SF 16 E

Page 1: ...CE 0694 ENGLISH Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED HEATER Model SF 16 E TYPE C ROOM SEALED...

Page 2: ......

Page 3: ...EM page 3 GENERAL INSTALLATION REQUIREMENTS page 5 BOILER INSTALLATION page 6 GAS OPERATIONS AND ADJUSTMENTS page 8 REGULATING THE GAS PRESSURE page 9 ELECTRICAL CONNECTIONS page 10 12 BOILER CONTROL...

Page 4: ...h an expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be p...

Page 5: ...Gas Type Methane Gas Liquid Gas LPG G20 G30 G31 Lower Wobbe Index at 15 C 1013 mbar MJ m3 34 02 0116 09 88 MJ Kg 45 65 46 34 Rated Feed Pressure mbar mmCA 20 204 30 306 37 377 Consumption m3 h 3 14 Kg...

Page 6: ...mes into flue duct and emission of air from outside N B To insert a flue bend reduce total length of flue by 0 5 m NOTE USE ORIGINAL RADIANT APPROVED FLUE KIT SYSTEMS FLUE ACCESSORIES AND FLUE DIAPHRA...

Page 7: ...nal dynamic pressure of 20m Bar 8 in wg at the boiler Installation pipes should be fitted in accordance with BS6891 1988 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from met...

Page 8: ...onditioning systems If this should occur the appliance MUST BE TURNED OFF IMMEDIATELY and the local gas region consulted Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balc...

Page 9: ...WALL The installation and fixing to wall of the water heater must conform to the national standards and safety norms Follow these instructions 1 With a spirit level min length 40 cm draw a line on the...

Page 10: ...ensions on p 5 Check the internal and external seal of the gas feed system If the unit is not used for an extended time close the main gas feed cock Conversion of the unit from Nat Gas to LPG must be...

Page 11: ...tors must be installed with new gaskets Reassemble the entire burner unit Attention after every disassembly and re assembly of gas connections check carefully with soap and water 3 Move the selector l...

Page 12: ...ctor back fig 2 to its original position Tighten the aluminium cap of the regulator remove the pressure gauge fig 3 and tighten the B pressure point screw Gas type Natural Gas Liquid gas LPG G20 G30 G...

Page 13: ...l as follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two side screws on the panel using the VT screwdriver and turn it to the position shown in...

Page 14: ...On off SENSOR INTERRUPTED OFF R 45Kohm ON R 45Kohm On off 0 PWM LINK FOR MINIMUM OUTPUT ADJUSTMENT NO CONTACT OK FAN OVER RUN TIME 8 min P1 0 CHECK PA 0 100 MIN OUTPUT CAP GPL P3 PWM SIGNAL GENERATOR...

Page 15: ...SENSOR CVI m MODULATION SIGNAL SP PWM BLACK LIMIT THERMOSTAT POWER SWITCH TEMPERATURE SENSOR POWER OM INDICATOR KEY IGNITION ON INDICATOR ST TL IG LT LF N NEUTRAL L LINE ST RED WHITE GREEN BLACK ROTAT...

Page 16: ...p Shut down requires manual resetting to restore operation wait ten seconds and then push reset button 5 Re ignition is provided if the main burner accidentally shuts down The heater will shut down if...

Page 17: ..._Line Neutral polarity reversed _Ionisation electrode _Ionisation electrode lead _Electronic ignition board _Reverse polarity _Check and adjust the electrode position _Replace it _Replace it Power in...

Page 18: ...up B Remove the tape and open the 4 flaps toward the outside C Remove the inside cardboard packing D Hold the water heater from the rear frame when lifting IMPORTANT The packing material cardboard is...

Page 19: ......

Page 20: ...1329 828555 All descriptions and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the ac...

Reviews: